Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 30, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of an educational facility in Santa Cruz, California. Completed plans call for the renovation of a 85,249-square-foot, 64-room educational facility.
This project entails comprehensive bathroom and shower renovations across eight dormitory facilities, specifically all "L" and "G" buildings. Work includes installing new plastic privacy doors on 64 existing shower compartments. In the "G" buildings, contractors will upgrade four existing, non-compliant accessible showers in single-occupancy, gender-neutral bathrooms, including removal of toilet compartment partitions and modification of sink counters and accessories. Work in the "L" buildings requires demolishing an interior, non-load-bearing wall to combine Rooms 120 and 122, converting them into four single-occupancy, gender-neutral accessible bathrooms with new accessible shower compartments and updated accessories. The scope also involves mechanical, electrical, and fire sprinkler modifications, interior finish updates (painting, lighting, flooring, furniture replacement), minor concrete work, saw cutting, and post-construction cleaning. All work must be coordinated with the University Representative and on-site contractors to maintain progress in every building. Bidding documents are available online. Bidders may be required to submit qualifications with their bids as set forth in the Supplementary Instructions to Bidders. All bidders must attend a mandatory Pre-Bid Conference and Job Walk. Bids must be submitted electronically by the specified deadline. The originally signed and notarized bid bond must be received within 2 business days of the bid opening at the provided address. Requests for clarification or interpretation of the Bidding Documents shall be received no later than 5:00 PM on Thursday, April 9, 2026 and addressed only to: William Comstock University of California, Santa Cruz Physical Planning, Development & Operations 1156 High Street, Barn G Santa Cruz, CA 95064 wcomstoc@ucsc.edu
Bid Results
Educational
$817,700.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2026
June 15, 2026
Multiple Locations, Santa Cruz, CA
Related To This Project
Santa Cruz, CA
Bid Date: Apr 23 2026
Santa Cruz, CA
Bid Date: Apr 16 2026
Santa Cruz, CA
Bid Date: Apr 24 2026
RFQ Construction Manager - Graham Hill Water Treatment Plant Facility Improvements Project - 6100889
Santa Cruz, CA
Bid Date: May 14 2026
Santa Cruz, CA
Bid Date: May 14 2026
Santa Cruz, CA
Bid Date: Apr 23 2026
Santa Cruz, CA
Bid Date: May 21 2026
Santa Cruz, CA
Bid Date: Apr 28 2026
Santa Cruz, CA
Bid Date: Apr 29 2026
Santa Cruz, CA
Bid Date: Apr 16 2026
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Apr 17 2026
Santa Cruz, CA
Bid Date: Apr 09 2026
Santa Cruz, CA
Bid Date: Mar 12 2026
Santa Cruz, CA
Bid Date: Mar 26 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
