Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 16, 2026
Site work and paving for a mixed-use development in Maple Valley, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Consultants for T-66 Compact Roundabout & Pedestrian Crossing Improvements Project (Federal Aid Project No. Hsip-000s(738)) Project Design Engineering Services Invitation the City of Maple Valley (the City) is Soliciting Qualifications From Consultant Firms With Expertise in Roadway & Transportation Design. The method of Contractor Selection has not been Determined at this time. This Agreement Will Be for Approximately Two (2) Years in Duration With the Option for the City to Extend It for Additional Time if Necessary. Consultants Will Be Considered to Provide Design Engineering Services for Installation of a Compact Roundabout at the Intersection of Se 248th St/lake Wilderness Park/224th Ave Se, and a Marked Crosswalk at Intersection of 216th Ave Se/se 280th St With Signage and Streetlights. The Compact Roundabout Intersection Will Include Pedestrian Crosswalks With Rectangular Rapid Flashing Beacons (Rrfb), Curb-separated Pedestrian Pathway, and Streetlights. The City Reserves the Right to Amend Terms of This Request for Qualifications (RFQ) to Circulate Various Addenda, or to Withdraw the RFQ at Any Time, Regardless of How Much Time and Effort Consultants Have Spent on Their Responses This Project Has 0% Fsbe Agreement Goal. he Preliminary Scope of Work to Be Performed by the Consultant Consists of: Preparation of Plans, Specifications, and Estimate (Ps&e) in Accordance With Wsdot Design Standards and Specifications and Based on Wsdot Lag Guidelines for Federally Funded Projects. Assessment of the Existing Condition of the Proposed Installation Location, Potentially Including but Not Limited to Traffic Engineering, Ada Compliance, Environmental Engineering Including Permitting and Documentation, Geometric, and Geotechnical Conditions and Limitations. Assessment of the Design and Construction Needs for a Compact Roundabout Intersection and Pedestrian Crossing Improvements Potentially Including but Not Limited to Engineering Survey, Geotechnical Assessment, Site Civil Design, Ada Compliance, Stormwater Management, Utility Installation and Relocation or Adjustment, Landscaping, and Construction Staging. Provide Permanent Easement and/or Temporary Construction Easement Services as Needed. Preparation of an Engineer Cost Estimate and Assisting With the Bid Procurement for Construction. Questions About This RFQ Must Be Emailed No Later Than 12:00 Pm (Local Time), May 8, 2026 to: Steven W. Chen, P.e. Deputy Public Works Director/city Engineer Steven.chen@ Maplevalleywa.gov Estimated Contract End Date december 31, 2027 Please Provide the Following Information for No Less Than Three (3) Relevant Projects With Similar Scope and Size That Have Been Completed or Are in Progress by Members of the Consultant Design Team. 1. Name of Project 2. Project Website, if Applicable 3. Brief Project Description Highlighting Special Attributes/features of the Project 4. Total Project Construction Cost or Engineering Estimate 5. Initial Budget and Final Budget for Design Services 6. Project Design Team 7. References With Name, Phone, and Email Contact Information All Costs for Developing Submittals in Response to This RFQ, and Scope of Work if Selected, Are the Obligation of the Consultant and Are Not Chargeable to the City. All Submittals Will Become Property of the City and Will Not Be Returned. Submittals May Be Withdrawn at Any Time Prior to Published Close Date, Provided Notification is Received in Writing to the Project Manager Listed on This RFQ.
Conceptual
Roads / Highways
$1,452,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2027
Multiple Locations, Maple Valley, WA
Related To This Project
Maple Valley, WA
--
Maple Valley, WA
Bid Date: Feb 10 2026
Maple Valley, WA
Bid Date: Jan 13 2026
Maple Valley, WA
Bid Date: Jan 06 2026
Maple Valley, WA
Bid Date: Dec 02 2025
Maple Valley, WA
Bid Date: Oct 28 2025
Maple Valley, WA
Bid Date: Oct 15 2025
Maple Valley, WA
Bid Date: Jun 26 2025
Maple Valley, WA
Bid Date: Jun 25 2025
Maple Valley, WA
Bid Date: Jun 06 2025
Maple Valley, WA
Bid Date: May 28 2026
Maple Valley, WA
Bid Date: May 29 2025
Maple Valley, WA
Bid Date: Jan 15 2026
Maple Valley, WA
Bid Date: Apr 02 2025
Maple Valley, WA
Bid Date: Oct 28 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
