Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 8, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of an educational facility in New Buffalo, Michigan. Completed plans call for the renovation of a educational facility.
For questions or to schedule a site visit, contact Mark German Director of Operations New Buffalo Area Schools 269-469-6017 mgerman@nbas.org The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the following Shingle Roof Replacement Removal of one (1) existing layer of shingles Removal of ridge cap, drip edge, and exhaust caps Installation of ice and water shield Installation of synthetic underlayment Installation of new drip edge (color to be confirmed by Owner) Installation of new ridge cap and exhaust caps Reuse of existing step flashing, headwall flashing, and counter flashing where feasible Installation of new architectural shingles (color to be confirmed by Owner) No deck replacement included in base scope No changes to existing ventilation system New Buffalo Area Schools is requesting proposals from qualified contractors to complete a shingle re -roof project at the HS /MS building . Work includes removal of existing roofing materials and installation of a new roofing system. The contractor shall provide all labor, materials, equipment, and supervision necessary to complete a shingle roof replacement, including removal of one existing layer of shingles, ridge cap, drip edge, and exhaust caps; installation of ice and water shield, synthetic underlayment, new drip edge, new ridge cap and exhaust caps; reuse of existing step flashing, headwall flashing, and counter flashing where feasible; installation of new architectural shingles (color to be confirmed by Owner). The base scope does not include deck replacement or changes to the existing ventilation system. Contractors may provide alternate pricing for installing double-lock standing seam metal roofing of approximately 46 squares, with all trims and accessories, and high-temperature ice and water underlayment for metal areas. The contractor is responsible for removal and proper disposal of all roofing debris and maintaining a clean and safe worksite throughout the project. All work may occur during normal working hours and must be coordinated to minimize disruption to school operations. Contractors must verify all field conditions prior to bidding, and any additional repairs or unforeseen conditions must be communicated before proceeding. Proposals must include company information, cost proposal with lump sum for base bid and a separate cost for optional metal roofing if provided, exclusions, project schedule, materials and specifications, warranty documentation, and proof of liability insurance. Contractors must demonstrate experience with commercial roofing projects, proper licensing in Michigan, ability to meet safety standards in an occupied school environment, and experience with both shingle and metal roofing systems.
Post-Bid
Educational
$300,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2026
May 18, 2026
Multiple Locations, New Buffalo, MI
Related To This Project
New Buffalo, MI
Bid Date: Apr 24 2026
New Buffalo, MI
Bid Date: Apr 15 2026
New Buffalo, MI
Bid Date: May 06 2026
New Buffalo, MI
Bid Date: May 28 2026
New Buffalo, MI
Bid Date: Apr 15 2026
New Buffalo, MI
Bid Date: Apr 15 2026
New Buffalo, MI
Bid Date: Mar 26 2026
New Buffalo, MI
Bid Date: Apr 01 2026
New Buffalo, MI
Bid Date: Nov 11 2025
New Buffalo, MI
Bid Date: Oct 03 2025
New Buffalo, MI
Bid Date: Sep 09 2025
New Buffalo, MI
Bid Date: Jul 10 2025
New Buffalo, MI
Bid Date: Jun 03 2025
New Buffalo, MI
Bid Date: Mar 13 2025
New Buffalo, MI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
