BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 21, 2026

This is a service / maintenance or supply contract in Fairfax, Vermont. Contact the soliciting agency for additional information.

The contractor shall furnish and deliver bulk highway road salt (sodium chloride) suitable for winter road maintenance operations. The Town anticipates purchasing approximately 1,200 – 2,000 tons per winter season. Delivery must be to the Town of Fairfax DPW Facility, 317 Fletcher Road, Fairfax, VT 05454, coordinated with the DPW Operations Manager. Vendors should be capable of delivering within 72 hours of request or sooner during emergency winter conditions. Salt must be highway grade sodium chloride meeting AASHTO M143 standards, free flowing and suitable for mechanical spreading. Proposals must clearly state price per ton delivered, any fuel surcharges, minimum loads if applicable, and pricing for treated salt if offered. The contract period shall cover the Winter Season 2026–2027, with the possibility of extension. Proposals must include vendor contact information, price per ton delivered, delivery capabilities, and references for similar municipal contracts. The Town of Fairfax reserves the right to accept or reject any or all proposals and is not required to select the lowest bid.

GC Bidding

Roads / Highways

$200,000.00

Public - City

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

August 15, 2026

Project location map

317 Fletcher Road, Fairfax, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.