BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of a municipal facility in West Lafayette, Indiana. Completed plans call for the renovation of a municipal facility.

PROJECT OVERVIEW This project consists of renovations to the existing men's restroom and women's restroom. Work includes ADA-compliant upgrades, fixture replacements, layout modifications, and finish improvements. 2. RESTROOM RENOVATIONS (MEN'S & WOMEN'S RESTROOMS) 2.1 ADA Compliance Upgrades o Ensure ADA-compliant walkways and clearances o Adjust door closer speeds to meet ADA standards o Install automatic fixtures and dispensers o Install ADA-compliant grab bars and restroom accessories o All new fixtures and layouts to comply with ADA requirements 2.2 Flooring o Prepare, scrape, and finish concrete flooring with stain and sealer in both restrooms o Tile floor in men's 4'x3' shower area o Use existing floor drains 2.3 Mechanical & Ventilation o Replace exhaust fans in both restrooms 2.4 Plumbing Fixtures Both Restrooms o Install new ADA height pressure assist toilets with open front seat and trim with hands free flush device o Install wide pedestal sink with auto on/off fixtures (ADA compliant height) Men's Restroom o Remove last toilet, install one wall-hung ADA urinal with battery-operated flush valve to replace existing toilet o Install new shower and plumbing fixtures (ADA compliant) o Partition off shower area, lockable with thumb latch o Tile 4'x3' shower floor area o Cut block wall at sink area (right side) to match left side block wall depth Women's Restroom o Convert existing shower area to mop sink/service area 2.5 Partitions & Doors o Install new solid plastic partition dividers in both restrooms with 1 ADA stall each and ADA grab bars o Replace bathroom entry doors and include: o Toe kicks o Door closers (ADA compliant settings) 2.6 Lighting & Electrical o Install new LED light fixtures in both restrooms o Install automatic lighting switches/sensors 2.7 Finishes o Install new signage (ADA compliant) o Prepare and paint walls and ceilings in both restrooms 3. GENERAL REQUIREMENTS o All work shall comply with applicable building codes and ADA requirements. o Coordinate all plumbing, electrical, and mechanical modifications as required. o Contractor to verify all field dimensions prior to fabrication and installation. o Protect adjacent areas during construction. o Customer will provide dumpster and haul away demo materials. Question Deadline 04/30/2026 Questions and clarifications can be submitted to: Alex Van Allen Facilities Manager City of West Lafayette 222 N. Chauncey Avenue West Lafayette, IN 47906 (765) 775-5168 avanallen@westlafayette.in.gov

Post-Bid

Municipal

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
74
Bidding Soon
1,118
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 4, 2026

Project location map

Multiple Locations, West Lafayette, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.