BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 16, 2026

Site work and paving for a mixed-use development in Novato, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; and transportation facility.

Reference Number 0000421301 Bid Intent Not Available The work to be done includes but is not limited to alterations to the existing Olive Avenue Rail Crossing and must be completed in compliance with California Public Utilities Commission (Commission/CPUC) General Order 88-B. Installation of three Omega concrete crossing panels; two modified junction boxes; two foundations for future pedestrian automatic gate arms; custom wing walls; relocation of vehicular automatic gate arm including new foundation; 4' x 5' chain link fence panel Z gates (typical of 2) with required signage; installation of two stencils - watch for train; 4' chain link fence; truncated domes; sidewalk / 10' wide concrete pedestrian pathway, curbs & gutters; placement of hot mix asphalt - roadway widening; K-rail; electrical pull box and two 4" conduits for future connection; 24" stop limit line; installation of new traffic signs and other items or details not mentioned above that are required by the contract documents. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Certification/Training - Certified Payroll - Contractors License Required - Insurance Required - License Required - Prevailing Wage Required Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Maintenance Bond 50 % - Payment Bond 100 % The bid must be accompanied by a bid guarantee in the amount of 10% of the total bid by 2:00 p.m. ON THE DATE ADVERTISED FOR THE OPENING OF BIDS. More specifically, pursuant to Public Contract Code 20170 and 20171, all bids for the project shall be presented, under sealed cover and shall be accompanied by one of the following forms of bidder's security in the amount of ten percent (10%) of the bid: (a) cash; (b) a cashier's check made payable to the City of Novato; (c) a certified check made payable to the City of Novato; or (d) a bidder's bond executed by an admitted surety insurer, made payable to the City of Novato. Such security shall be forfeited should the successful bidder to whom the contract is awarded fails to timely execute the contract and to deliver the necessary bonds and insurance certificates as specified in the contract documents. Question Deadline 04/30/2026 at 2:00 PM PT Questions are submitted online Yes, If you have any questions, please contact Petr Skala, Associate Engineer, at (415) 899-8237 or pskala@novato.org The AGENCY reserves the right to reject any and all bids.

Post-Bid

Transportation Terminals

$500,000.00

Public - City

Paving, Site Work

28

14

20

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

June 4, 2026

Project location map

Olive Ave, Novato, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.