Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 25, 2026 at 8:00 PM
Updated May 16, 2026
Renovation of a municipal facility in Tuxedo Park, New York. Completed plans call for the renovation of a 5,500-square-foot municipal facility.
Roof Replacement At P-98 (Lakeville) House At Sterling Forest State Park - Roofing Remove all shingles and roofing materials, gutters, leaders, and flashing. Inspect and replace all unserviceable roof decking ensuring roof deck meets installation requirement set by the shingle manufacturer. Include in the quote the cost to replace 15 sheets of 3/4 -inch CDX plywood. Install Grace Ice and Water Shield over the entire properly prepared roof deck. Replace 10 linear ft of fascia on the southwest side, replace 15 linear ft of fascia on the northeast side of the house, and replace any unserviceable fascia not outlined. Wrap all fascia in aluminum (white) once repairs are completed. Install all new drip edge (white) around perimeter of roof, approximately 450 linear feet. Replace 2- 3" waste vent, 1 -2" waste vent, 1- 1.5" waste vent, 3 - exhaust vents, replace all step and chimney flashing and install 24' of mono slope roof flashing on north side of house. Install GAF UHD shingles (Slate) using 6 nails per shingle. Use GAF starter shingles and ridge cap (Slate). Install all new seamless 6-inch gutters and leaders (white) around the inside perimeter (pool side) and the rear of the house over the decks, approximately 193 linear feet. Question Deadline 05/06/2026 at 3:00 PM ET Please direct all technical questions to Park Manager, Michael McElroy at michael.mcelroy@parks.ny.gov or Call 845-351-5907.
Post-Bid
Municipal
$80,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 13, 2026
June 12, 2026
6 Moore Dr, Tuxedo Park, NY
Related To This Project
Tuxedo Park, NY
Bid Date: Jun 11 2026
Tuxedo Park, NY
Bid Date: May 14 2026
Tuxedo Park, NY
Bid Date: Oct 22 2025
Tuxedo Park, NY
Bid Date: Oct 03 2025
Tuxedo Park, NY
Bid Date: Oct 03 2025
Tuxedo Park, NY
Bid Date: Oct 03 2025
Tuxedo Park, NY
Bid Date: Jul 29 2025
Tuxedo Park, NY
Bid Date: Jul 29 2025
Tuxedo Park, NY
Bid Date: Jul 29 2025
Tuxedo Park, NY
Bid Date: Apr 04 2025
Tuxedo Park, NY
Bid Date: Jul 11 2024
Tuxedo Park, NY
Bid Date: May 23 2024
Tuxedo Park, NY
--
Tuxedo Park, NY
Bid Date: Dec 15 2021
Albany, NY
Bid Date: May 13 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
