BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 16, 2026

Renovation of an educational facility in Aplington, Iowa. Completed plans call for the renovation of a educational facility.

Re-Roof of the existing school building including base bid and alternate bid as described in the construction documents. Include all new sheet metal caps, parapets, flashings as required for a complete roof assembly. Project cost is anticipated to be under $1,300,000.00. A single bid will be received for the work of the General Contractor including the work of all subcontractors. Subcontractors of all construction trades shall submit bids to the General Contractors. All sealed lump sum bids prepared in compliance with the Instructions to Bidders must be received at the specified location and time. Bid security shall be submitted with each bid in an amount not less than five percent (5%) of the bid amount. No bid may be withdrawn for a period of 60 calendar days following the date of the opening of bids. The Owner reserves the right to reject any and all bids, re-advertise for new bids, and to waive informalities and irregularities in the bids submitted. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the work. A Prebid meeting for all bidders will not be held; contractors shall contact the school to schedule roof access for review. The contract shall be awarded to the lowest responsible bidder whose bid is in conformance to the Bidding Documents. Bids may be held for a period not to exceed sixty (60) days from the date of the opening to review the bids and investigate the qualifications of bidders. Preference shall be given to products, provisions, and labor grown, produced or sourced within the State. Successful bidder shall begin work upon contract execution and shall complete all work on or before the specified date. The successful bidder will be required to furnish a Performance Bond and a Payment Bond within ten days after award in an amount equal to one hundred percent of the contract price. Contractors and approved subcontractors will be provided a Sales Tax Exemption Certificate to purchase building materials and/or supplies required in the performance of the construction contract.

Post-Bid

Educational

$1,300,000.00

Public - City

Renovation

6

9

2

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
93
Bidding Soon
844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

July 13, 2026

Project location map

215 10th St, Aplington, IA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.