BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 14, 2026

Site work and paving for a mixed-use development in Kennewick, Washington. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

This project is for HMA improvements for the following streets: Canal Dr. (Edison St. to Volland St.), Southridge Blvd. (Ridgeline Dr. to Hildebrand Blvd.), Union St. / W. 43rd Ave. (Canyon Lakes Dr. to Olson St.), 42nd Ave. (Union St. to Olson St.), Olson St. (47th Ave. to Canyon Lakes Dr.). Work will involve planing (grinding) as called for on the plans, HMA overlay, HMA patching repair of miscellaneous failed areas, concrete sidewalk, curb, ramp upgrades, pavement lane striping, crosswalks, stop bars, markings, cast-in-place traffic curbing, and other related work. All bid proposals must be accompanied by a bid proposal deposit in cash, certified check, cashier's check or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Kennewick. The City of Kennewick reserves the right to waive any informalities or to reject any or all bids. Engineer's Estimate: $1,200,000 to 2,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For questions or additional information, please call Design Services Manager, Heath Mellotte 509-585-4287.

Sub-Bidding

Roads / Highways

$2,100,000.00

Public - City

Paving, Site Work

17

6

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2026

July 20, 2026

Project location map

Multiple Locations, Kennewick, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.