Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 6, 2026 at 8:00 PM
Updated May 16, 2026
Site work for a mixed-use development in Forest Grove, Oregon. Completed plans call for site work for a military facility; and water / sewer project.
This project involves the construction of an oil and water separator at the Oregon Military Department's Forest Grove Field Maintenance Shop. The project is subject to BOLI requirements. Bidders and subcontractors must be registered with the Oregon Construction Contractors Board at the time of bid. The following range is a project estimate for bonding purposes only: $180,000 to $200,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Install Oil / Water Separator to service existing wash rack per provided engineered drawings and specifications. Include all required permits, locates, site work and repaving required to have a complete and usable wash rack facility and parking area. Bidders Are Required to Be on Time and Attend the Entirety of the Mandatory Pre-bid Conference Directly or Through an Authorized Representative and Must Register on the Official Sign in Sheet. Bids From Bidders WHO Do Not Comply With These Attendance Requirements Will Be Rejected as Non-responsive.
GC Bidding
Military
$200,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2026
July 25, 2026
2900 Taylor Wy, Forest Grove, OR
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
