Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 8, 2026 at 8:00 PM
Updated June 11, 2026
Site work and paving for a transportation facility in Clear Lake, Iowa. Completed plans call for site work for a transportation facility.
The general nature of the work consists of pavement rehabilitation on Runway 18/36, and on Runway 12/30, Taxiway A, Taxiway B, and Taxiway C within the Runway 18/36 safety area. The pavement rehabilitation method is bituminous pavement mill and overlay. General project scope items and quantities include: bituminous pavement milling (variable depth, 2-inch nominal - 125,000 SY); P-401 bituminous pavement overlay (3 inch - 22,500 Ton); airfield electrical installation; airfield pavement marking removal (55,000 SF); airfield pavement markings (160,000 SF); crack repair (34,500 LF); sawcut grooves (100,000 SY); fill and abandon existing edge drain (7,650 LF); subdrain installation (6,650 LF); runway and taxiway edge earthwork, erosion control, and turfgrass stabilization. Bid security in the amount of five percent (5%) of the bid must accompany each bid. All proposals will be evaluated and may be held for up to 30 days from the bid opening date for evaluation. Award of contract will be to the lowest responsive proposal meeting all requirements. The right is reserved to reject any and all bids and to waive any informality. Award of contract is contingent upon the Owner receiving federal funding assistance. All work must comply with relevant federal statutes, executive orders, and regulations, including but not limited to Buy American laws, civil rights assurances, labor standards, and anti-kickback requirements. The contractor must submit a certification of compliance with FAA's Buy American Preference and BABA with their bid. Additional federal provisions and requirements apply as specified. Pre-bid conference attendance is encouraged, and bid documents are available by request. Question Deadline 05/22/2026 at 5:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, or through mail. Contact individual shall be as follows: Ryan Turner, PE Foth Infrastructure & Environment, LLC 106 SW 7th Street, Suite 200 Des Moines, Iowa 50309 (515) 251-2532 (desk) (515) 664-7576 (mobile) ryan.turner@foth.com The Engineer's opinion of probable construction cost for the work falls within a range of $6,400,000 and $7,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Transportation Terminals
$6,539,784.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
June 14, 2027
9184 265th St, Clear Lake, IA
Related To This Project
Clear Lake, IA
Bid Date: May 14 2026
Clear Lake, IA
Bid Date: Apr 15 2026
Clear Lake, IA
Bid Date: Apr 06 2026
Clear Lake, IA
--
Clear Lake, IA
Bid Date: Feb 19 2026
Clear Lake, IA
Bid Date: Jan 16 2026
Clear Lake, IA
Bid Date: Dec 16 2025
Clear Lake, IA
--
Clear Lake, IA
--
Clear Lake, IA
Bid Date: Nov 20 2025
Clear Lake, IA
Bid Date: Nov 20 2025
Clear Lake, IA
--
Clear Lake, IA
Bid Date: May 22 2026
Clear Lake, IA
Bid Date: Oct 23 2025
Clear Lake, IA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
