BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2026 at 8:00 PM

Updated June 3, 2026

Site work, paving and new construction of a bridge / tunnel in Valparaiso, Indiana. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Question Deadline 05/26/2026 at 4:00 PM CT Submit all questions in writing to UNITED CONSULTING prior to No questions will be answered by telephone. Questions shall be submitted via email to john.sangiorgio@ucindy.com and christopher.dantonio@portercountyin.gov. The project is located on CR 200 W that crosses Salt Creek at approximately 0.3 miles South of US 6, Sections 27, 28, Township 36 North, and Range 6 West in Liberty Township of Porter County, Laporte District, Indiana. The project consists of the replacement of an existing bridge with a new single-span bridge. The overall purpose of the project is to replace the existing structurally deficient bridge and improve the conveyance of Salt Creek under the bridge. The work consists of the replacement of an existing bridge with a new single-span bridge on CR 200 W over Salt Creek in Porter County, Indiana. The main objectives are replacing the structurally deficient bridge and improving the conveyance of Salt Creek under the bridge. The new structure will be a single-span prestressed concrete box beam bridge with a total deck length of 44-6 5/8 and a span of 43-0, supported on reinforced concrete abutments on steel H-piles. The bridge cross-section will include two 11-0 travel lanes and two 3-8 shoulders for a clear roadway of 29-4. Type FC bridge will be installed, with an out-to-out coping width of 32-4. Reinforced concrete approaches will be constructed behind both abutments. The bridge will have a 15 skew to the channel, and the structure elevation will provide at least 1-0 of freeboard above the Q100 elevation. The project also includes demolition and removal of the existing structure, installation of the proposed structure, and all duties and furnishing of labor, materials, tools, equipment, and incidentals necessary or convenient for project completion.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - County

New Construction, Paving, Site Work

35

8

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
487
Active Projects
315
Bidding Soon
4,159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

August 3, 2026

Project location map

Multiple Locations, Valparaiso, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.