Published June 10, 2026 at 8:00 PM
Updated June 11, 2026
Site work and paving for a road / highway in Pinole, California. Completed plans call for paving for a road / highway; and for site work for a road / highway.
Project includes pavement rehabilitation. Question Submission Deadline : May 26 , 2026 , 4:00 pm Question Response Deadline : May 29 , 2026 , 4:00 pm The Engineer's Estimate is $2,295,341.95. DESCRIPTION OF WORK: The WORK includes: - Mobilization - Establish Traffic Control Plan following City's approval and consistent with MUTCD - Construction Survey - Remove Existing Speed Hump - Cold Plane Existing Asphalt Concrete Pavement 2-Inches Uniform Depth - Construct 2-Inch Thick Rubberized Hot Mix Asphalt-Gap Graded (RHMA-G) Overlay. - Construct Slurry Seal Type II with 2.5% Latex - Crack Seal All Cracks With 0.25-Inch Wide Or Greater And Herbicide - Remove AC, AB, And Subgrade Construct 6-Inch Asphalt Concrete Over 12-Inch Relative Compacted Native - Remove And Construct Curb Ramp Per Caltrans STD A88A, Case Per Plan - Construct Speed Hump Per CCCSP STD Plan CA55 - Construct Raised AC Crosswalk per Detail - Remove and Construct 4-Inch Thick PCC Sidewalk Per Caltrans STD A88A - Remove and Construct Modified Curb and Gutter Per Detail On Plan - Install Caltrans Type 18-8C Grate Per STD D778 - Install Cast-In Place Truncated Domes Per Caltrans STD Plan A88A - Adjust Manhole Frame and Cover to Grade - Adjust Water Valve to Grade - Adjust Pull Box to Grade - Re-establish Monuments, Centerline Ties, Corner Ties, And Any Other Survey Markers. - Install sign and/or post - Remove sign and/or post - Install Detail 2 (Thermo) - Install Detail 22 (Thermo) - Install Detail 29 (Thermo) - Install Detail 38 (Thermo) - Install Detail 39 (Thermo) - Install 12" White Line (Thermo) - Install White Continental Crosswalk per Detail on plan (Thermo) - Install Yellow Continental Crosswalk per Detail on plan (Thermo) - Install Pavement Markings (Thermo) - Install Green-Backed Bike Lane per Detail "A" (Green MMA, Non-Skid) - Install Green Bike Lane Skips per Detail "B" (Green MMA, Non-Skid) - Install Speed Table Striping per Detail "C" (Thermo) - Install Speed Hump Striping and Advance Speed Hump Striping per Detail "D" and Detail "E" (Thermo) - Paint Curb Markings (Two-Coats) - Remove Traffic Stripe and Pavement Markings
Post-Bid
Roads / Highways
$2,295,342.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 8, 2026
July 23, 2026
Multiple locations, Pinole, CA
Related To This Project
Pinole, CA
Bid Date: May 29 2026
Pinole, CA
Bid Date: Apr 15 2026
Pinole, CA
Bid Date: Apr 06 2026
Pinole, CA
Bid Date: Mar 13 2026
Pinole, CA
Bid Date: Mar 17 2026
Pinole, CA
Bid Date: Feb 11 2026
Pinole, CA
Bid Date: Feb 25 2026
Pinole, CA
Bid Date: Jan 30 2026
Pinole, CA
Bid Date: Feb 18 2026
Pinole, CA
Bid Date: Apr 14 2026
Pinole, CA
Bid Date: Jan 23 2026
Pinole, CA
Bid Date: Dec 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.