BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 11, 2026

Site work and paving for a road / highway in Pinole, California. Completed plans call for paving for a road / highway; and for site work for a road / highway.

Project includes pavement rehabilitation. Question Submission Deadline : May 26 , 2026 , 4:00 pm Question Response Deadline : May 29 , 2026 , 4:00 pm The Engineer's Estimate is $2,295,341.95. DESCRIPTION OF WORK: The WORK includes: - Mobilization - Establish Traffic Control Plan following City's approval and consistent with MUTCD - Construction Survey - Remove Existing Speed Hump - Cold Plane Existing Asphalt Concrete Pavement 2-Inches Uniform Depth - Construct 2-Inch Thick Rubberized Hot Mix Asphalt-Gap Graded (RHMA-G) Overlay. - Construct Slurry Seal Type II with 2.5% Latex - Crack Seal All Cracks With 0.25-Inch Wide Or Greater And Herbicide - Remove AC, AB, And Subgrade Construct 6-Inch Asphalt Concrete Over 12-Inch Relative Compacted Native - Remove And Construct Curb Ramp Per Caltrans STD A88A, Case Per Plan - Construct Speed Hump Per CCCSP STD Plan CA55 - Construct Raised AC Crosswalk per Detail - Remove and Construct 4-Inch Thick PCC Sidewalk Per Caltrans STD A88A - Remove and Construct Modified Curb and Gutter Per Detail On Plan - Install Caltrans Type 18-8C Grate Per STD D778 - Install Cast-In Place Truncated Domes Per Caltrans STD Plan A88A - Adjust Manhole Frame and Cover to Grade - Adjust Water Valve to Grade - Adjust Pull Box to Grade - Re-establish Monuments, Centerline Ties, Corner Ties, And Any Other Survey Markers. - Install sign and/or post - Remove sign and/or post - Install Detail 2 (Thermo) - Install Detail 22 (Thermo) - Install Detail 29 (Thermo) - Install Detail 38 (Thermo) - Install Detail 39 (Thermo) - Install 12" White Line (Thermo) - Install White Continental Crosswalk per Detail on plan (Thermo) - Install Yellow Continental Crosswalk per Detail on plan (Thermo) - Install Pavement Markings (Thermo) - Install Green-Backed Bike Lane per Detail "A" (Green MMA, Non-Skid) - Install Green Bike Lane Skips per Detail "B" (Green MMA, Non-Skid) - Install Speed Table Striping per Detail "C" (Thermo) - Install Speed Hump Striping and Advance Speed Hump Striping per Detail "D" and Detail "E" (Thermo) - Paint Curb Markings (Two-Coats) - Remove Traffic Stripe and Pavement Markings

Post-Bid

Roads / Highways

$2,295,342.00

Public - City

Paving, Site Work

17

18

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
196
Bidding Soon
3,663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2026

July 23, 2026

Project location map

Multiple locations, Pinole, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.