Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2026 at 8:00 PM

Updated June 10, 2026

Remodeling of a mixed-use development in New Buffalo, Michigan. Completed plans call for the remodel of a educational facility; and educational facility.

New Buffalo Area Schools is requesting proposals from qualified contractors for the furnishing, delivery, removal, and installation of corridor lockers at both the High School and Middle School campuses. The contractor shall provide all labor, materials, equipment, supervision, delivery, installation, and coordination necessary to complete the locker replacement project. Work includes furnishing and installing new lockers, removing existing lockers where indicated, providing recessed trims, fillers, closure panels, accessories, numbering, and built-in locks, anchoring lockers to floors and walls, coordinating with district schedules, protecting surrounding areas, and disposing of removed materials offsite unless otherwise directed. High School work includes providing 229 standard duty single tier lockers (18"W x 15"D x 72"H), with removal in specified wings. Middle School work includes providing 164 lockers of the same size, plus 14 lockers (24"W x 15"D x 72"H), and removing approximately 239 recessed lockers. Quantities and dimensions must be field verified prior to ordering. Lockers must meet specified construction standards, color, and ADA requirements. Installation must be to manufacturer requirements and include all necessary adjustments and repairs. Bidders must submit product data, shop drawings, color samples, warranty documentation, installation schedules, lead times, and references. The proposal should include base bid price, alternate pricing, labor and material breakouts, warranty information, lead times, and any exceptions. The district reserves the right to reject proposals, waive informalities, and modify the scope as needed. Site visits are recommended prior to submitting proposals, and the scope may be adjusted based on field conditions. The successful contractor shall provide all labor, materials, equipment, supervision, delivery, installation, and coordination necessary to complete the locker replacement project. Work shall include: Furnish and install new lockers Remove existing lockers where indicated Provide recessed trims, fillers, closure panels, and accessories Provide numbering and built-in locks Anchor lockers to existing floors and walls Coordinate work with district summer schedules Protect surrounding finishes and adjacent construction areas Dispose of removed materials offsite unless otherwise directed by the district For questions or to schedule a site visit, contact: Mark German Director of Operations New Buffalo Area Schools 269-469-6017 mgerman@nbas.org

GC Bidding

Educational

$300,000.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
63
Bidding Soon
3,072
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2026

June 30, 2026

Project location map

Multiple Locations, New Buffalo, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.