BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Renovation of a municipal facility in Tuxedo Park, New York. Completed plans call for the renovation of a 2,620-square-foot municipal facility; and 2,025-square-foot municipal facility.

ROOFS REPLACEMENT AT P-86 (AUGUSTA COTTAGE) & P-91 (RAMAPO HOUSE) AT STERLING FOREST STATE PARK. The Office of Parks, Recreation and Historic Preservation (OPRHP) is seeking quotes for a full replacement of the existing roof systems; includes removal and disposal of old roofing materials and installation of new roof systems for 2 houses totaling approximately 4,645 square feet of roofing. Question Deadline 06/23/2026 at 3:00 PM ET Please direct all technical questions to Park Manager, Michael McElroy at michael.mcelroy@parks.ny.gov or Call 845-351-5907. Scope of Work: Augusta Cottage P-86, 7 Reception Road. ~ 2,025 Sq Ft: - Remove all shingles and roofing materials, gutters, leaders, and flashing. - Inspect and replace all unserviceable roof decking ensuring roof deck meets installation requirement set by the shingle manufacturer. Include in the quote the cost to replace 10 sheets of 3/4 -inch CDX plywood. - Install Grace Ice and Water Shield over the entire properly prepared roof deck. - Replace all rotten fascia found during demo. Once all necessary fascia repairs are made wrap all the fascia with aluminum (brown). - Install all new drip edge (brown) around the perimeter of the roof. Approximately 180 linear feet. - Replace 2- 5" waste vents, 4 - exhaust vents, and 1 - 12" boiler exhaust vent. - Install GAF UHD shingles (Barkwood) using 6 nails per shingle. Use GAF starter shingles and ridge cap (Barkwood). - Install GAF Cobra ridge vent over attic space, ~ 25 linear feet. - Install all new seamless 6-inch gutters and leaders (brown). Gutter to be installed both front and rear of Cottage, approximately 105 linear feet. Ramapo House P-91, 45 Reception Road. ~ 2,620 SQ FT: - Remove all shingles and roofing materials, gutters, leaders, and flashing. - Inspect and replace all unserviceable roof decking ensuring roof deck meets installation requirement set by the shingle manufacturer. Include in the quote the cost to replace 10 sheets of 3/4 -inch CDX plywood. - Install Grace Ice and Water Shield over the entire properly prepared roof deck. - Replace all rotten fascia found during demo. Once all necessary fascia repairs are made wrap all the fascia with aluminum (brown). - Install all new drip edge (brown) around the perimeter of the roof. Approximately 220 linear feet. - Replace 3- 4" waste vents, step and chimney flashing around 2 chimneys. - Install GAF UHD shingles (Barkwood) using 6 nails per shingle. Use GAF starter shingles and ridge cap (Barkwood). - Install GAF Cobra ridge vent over attic space ~38 linear ft. - Install all new seamless 6-inch gutters and leaders (brown). Gutter to be installed on entire front and over all decks side and rear of house. Approximately 167 linear feet.

Sub-Bidding

Municipal

$100,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,040
Active Projects
557
Bidding Soon
8,069
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2026

July 30, 2026

Project location map

Multiple Locations, Tuxedo Park, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.