BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 17, 2026 at 8:00 PM

Updated July 20, 2026

Renovation of a mixed-use development in Norristown, Pennsylvania. Working plans call for the renovation of a medical facility.

This Project Is A Standard Low Bid Project And Includes General, HVAC, Plumbing And Electrical Construction. Liquidated Damages = (.1A) $7,000 per day, (.IB) $7,000 per day, (.1C) $5,000 per day, (.ID) $5,000 per day, (.IE) $6,000 per day, (.IF) $2,000 per day, (.2) $12,500 per day, (.2A) $8,000 per day, (.3) $7,000 per day, (.4) $13,000 per day, (.4A) $5,000 per day, (.5) $3,000 per day, (.6) $1,500 per day. There is no Bid Guaranty required for this Project. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 -General Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 6% VBE = 3% .1A - Site Work Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 13% VBE = 3% .IB - Structural Steel Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .1C - Concrete Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .ID - Masonry/Stone Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 17% VBE = 3% .IE - Exterior Glass/Glazing Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .IF - Flooring Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .2 - HVAC Construction ALL BASE BIDS (#1, #2, #3 &. #4) SDB = 9% VBE = 3% .2A - Sheet Metal Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 10% VBE = 3% .3 - Plumbing Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .4 - Electrical Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 13% VBE = 3% .4A - Site Electrical Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 13% VBE = 3% .5 - Fire Protection Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .6 - Elevator Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = NA VBE = NA Duration : 1095 Calendar Days from date of Initial Job Conference

Final Planning

$278,000,000.00

Public - State/Provincial

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,093
Active Projects
30
Bidding Soon
7,583
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.