Published August 7, 2026 at 8:00 PM

Updated August 12, 2026

Renovation of a municipal facility in Rigby, Idaho. Completed plans call for the renovation of a municipal facility.

Question Deadline 07/29/2026 at 2:00 PM PT Questions regarding the Request for Proposal and Bid must be submitted in writing and received by Big-D Construction. Questions received after this day and time will not be considered. Submit questions via email to tim.bybee@big-d.com Furnish, deliver, unload, protect, erect, and provide all labor, material and equipment required to perform all PLUMBING work Also included, but not specifically limited to: 1. Provide demolition for all plumbing systems and plumbing component demolition activities. 2. Provide final cleaning of equipment, piping, valves, etc. to remove any dust that accumulated during construction. 3. Provide lock-out / tag-out of valves for isolation. 4. Provide excavation, backfill, and compaction for any underground plumbing. 5. Provide proper bedding for all underground piping. 6. Provide joint sealants / caulking at plumbing fixtures where they abut dissimilar materials. 7. Provide ADA shower, water heater, expansion tank, fixtures, valves and fittings. 8. Provide all waste and vent piping and domestic water lines (copper). 9. Provide 4" grease line from catch basin inside shop area to exterior of building and make connection to existing grease line. Reroute piping for new crane footings. 10. Provide proper seal for all roof penetrations for plumbing scope of work. 11. Provide potable water pipe insulation, handicap fixture insulation and underground plumbing insulation. 12. Furnish and install engineering, labor, material, and equipment necessary for a complete anchorage and seismic restraints as described in Contract Documents. 13. Division 22 must be fully coordinated with Division 23 and 26 to ensure that all required components of the work are included and fully understood . No additional cost shall be accrued to the Owner or General Contractor as a result of lack of coordination. 14. Keep all valves accessible. Provide access doors where valves are concealed behind hard, inaccessible surfaces finishes. 15. Provide all penetration and joint firestopping for this scope of work. Maintain fire and sound rating in walls/ceilings/floors penetrated . Any penetration through a rated assembly shall be fire-stopped with a UL-Listed assembly acceptable to the Engineer and MA Architects

Post-Bid

$400,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
9
Bidding Soon
222
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2026

September 7, 2026

Project location map

206 N Yellowstone Hwy, Rigby, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.