BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2026 at 8:00 PM

Updated August 2, 2026

Renovation of a detention facility in Kincheloe, Michigan. Completed plans call for the renovation of a detention facility.

Remove all overhead medium-voltage distribution poles, wires, pole-mounted transformers, pad-mounted transformers for K-Unit and MSI Building. Remove medium-voltage underground feeders to K-Unit, MSI Building pad-mount transformer, Admin Building pad-mount transformer, and back to Powerhouse pad-mount transformer. Remove secondary overhead feeders to buildings. Remove secondary underground feeders to MSI Building. Remove main Distribution Panels in Warehouse Building, MSI Building, Tech Building, Maintenance Shop and replace with new panels. Install new mediumvoltage underground distribution with new low profile pad-mounted switches, new pad-mounted medium-voltage transformers, and underground medium-voltage wiring. Install new underground secondary feeders to Buildings 240, 243, Warehouse, MSI Building, Maintenance Building, and Tech Building. Install new main distribution panels in Warehouse, MSI Building, Tech Building, and Maintenance Building. Bid(5%) Question Deadline 08/24/2026 at 12:00 PM ET Please do not submit online questions via electronic ALL questions should be emailed to Joe Sovis at jsovis@matrixceinc.com

Sub-Bidding

$350,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
13
Bidding Soon
157
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

November 2, 2026

Project location map

4533 W Industrial Pk Dr, Kincheloe, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.