Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 10, 2025 at 7:00 PM
Updated November 11, 2025
Site work for a mixed-use development in Kincheloe, Michigan. Completed plans call for site work for a detention facility; and power facility.
All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith at email address: SmithD76@michigan.gov. The email "Subject" must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). Requesting a Design Build entity for the development of design documents and replacement of the existing steam surge tank located in the powerplant at Chippewa Correctional Facility. The project is to include the removal of the existing surge tank and associated piping and equipment (will require design and details to remove the existing steam tank (the existing skid should be able to remain) - removal will likely have to go through the existing insulated metal panel wall system) and the installation of a new steam purge tank, piping, valves and controls that is to be tied together with the existing DA tank for system redundancy. There is a high pressure drip line that is currently tied into a low pressure line that will need to be reworked and tied into the existing DA tank. The purge tank and associated control system shall be Cleaver Brooks. Construction activities that that require the boiler/steam system to be shut down cannot occur anytime during the heating season. Interested bidders shall provide a complete Proposal for all required Professional and Construction Services. The consulting services shall be in compliance with the State of Michigan, Department of Management and Budget Contract for Professional Services and DMB Facilities Administration, Design and Construction Division policies and procedures (DMB 430). Proposals shall include Phase 500 Final Design, Phase 600 and 700 Construction Administration services as required. 5% BID SECURITY REQUIRED. REFERENCE STANDARDS: This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA and DOT), state agencies (DHHS, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply. Question Deadline 08/08/2025 at 12:00 PM ET - ACCEPTING QUESTIONS UNTIL: Please do not submit online questions via SIGMA VSS. ALL questions should be emailed to Alan Goschka at goschkaa@michigan.gov address
Award
Power Plant
$566,775.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
September 19, 2025
4269 M-80, Kincheloe, MI
Related To This Project
Kincheloe, MI
Bid Date: Oct 01 2025
Kincheloe, MI
Bid Date: Oct 08 2025
Kincheloe, MI
Bid Date: Dec 03 2025
Kincheloe, MI
Bid Date: Jan 21 2026
Kincheloe, MI
Bid Date: Jul 17 2025
Kincheloe, MI
Bid Date: Dec 10 2025
Kincheloe, MI
Bid Date: Apr 23 2025
Kincheloe, MI
Bid Date: Apr 09 2025
Kincheloe, MI
Bid Date: May 22 2025
Kincheloe, MI
--
Kincheloe, MI
Bid Date: Mar 12 2025
Kincheloe, MI
Bid Date: Feb 13 2025
Kincheloe, MI
Bid Date: Feb 19 2025
Kincheloe, MI
Bid Date: Jan 15 2025
Kincheloe, MI
Bid Date: Dec 18 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
