BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2025 at 8:00 PM

Updated October 11, 2025

Renovation of a detention facility in Kincheloe, Michigan. Conceptual plans call for the renovation of a detention facility.

As of October 10, 2025, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: site walk description : (Dept. of Corrections ONLY) All contractor/vendor representatives attending a Pre-Bid Walk Through Meeting must submit a Vendor/Contractor LEIN Request five business days prior to the meeting date, (See the attached Vendor/Contractor LEIN Request form). Send the LEIN Request form, filled out and signed, by email to Daniel T. Smith & Sharon Frost at email addresses: SmithD76@michigan.gov & FrostS1@michigan.gov .The email "Subject" must include (Facility Name, Project Name, Date & Time of Pre-Bid Walk Through Meeting). An individual is only permitted to represent one bidder at a mandatory walk-through. The Kinross Correctional Facility is replacing the existing Personal Protection Device (PPD) system throughout the entire facility. The existing system is a Senstar Flare Gen 1 system with the new system to be a Guard 1 PPD system. The Professional Services Contractor (PSC) is to provide a proposal for Phase 500 Final Design and Phase 600/700 Construction Administration services to field investigate and document the existing system in its entirety, including existing head end unit locations and existing emergency power availability conditions. New IP based head end units are to be installed at existing locations or in new data racks, TBD. Develop plans/specifications to replace the PPD system, develop an installation plan so that the new system is operational for 30 days prior to shut down and removal of the existing system, submission for plan review, pre-bid walkthrough and evaluation recommendation along with construction administration services. The PSC Proposal (Technical and Cost) for all required Professional Architectural and Engineering Services shall be in compliance with the State of Michigan, Department of Technology Management and Budget DTMB Project Statement Form (DMB427), DTMB ISID Billable Rate Professional Services Contract and the DTMB 430 RFP Billable Rate Form (DMB 430) and DTMB Facilities Administration, Design and Construction Division policies and procedures for the development of Contract Bid Documents and Construction Administration. A proposed schedule for design, bidding and construction must be included. Question Deadline - 04/04/2025 at 2:00 PM E - Please do not submit online questions via VSS. ALL questions should be emailed to Alan Goschka at goschkaa@michigan.gov.

Conceptual

Jails / Prisons

$510,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2026

Project location map

4533 Industrial Park Dr, Kincheloe, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.