BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2025 at 7:00 PM

Updated March 4, 2025

Renovation of a detention facility in Kincheloe, Michigan. Completed plans call for the renovation of a detention facility.

472/24395.ABG; Chippewa CF - Control Door Lock Upgrades PROJECT ADDRESS (if applicable) 4269 West M-80, Kincheloe, MI 49788 The Chippewa Correctional Facility wants to replace existing doors, frames, hardware and lock control system throughout various campus buildings - please see the attached floor plans which depict the door locations to be replaced. The Professional Services Contractor (PSC) is to provide a proposal for Phase 500 Final Design and Phase 600/700 Construction Administration services to field investigate and document the existing door conditions, develop plans/specifications to replace the scheduled security door locations and replace the security control system at each unit. Note that the security doors are essential security and access/egress to daily facility operation, and operation of the entire facility will be sensitive to and affected by work in these areas. Consequently, the replacement of the doors will likely be required to be done one-at-a-time and sequentially. Limitations on the duration of security door area downtime during construction will be required and strict compliance maintained. Please do not submit online questions via VSS. ALL questions should be emailed to Alan Goschka at goschkaa@michigan.gov address no later than 2:00 p.m., Eastern on Thursday, February 6, 2025

Award

Jails / Prisons

Public - State/Provincial

Renovation

6

5

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

March 17, 2025

Project location map

4269 M-80, Kincheloe, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.