BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 9, 2026 at 8:00 PM

Updated September 11, 2026

Demolition, site work and paving for a mixed-use development in Florence, Colorado. Completed plans call for the demolition of a road / highway; sidewalk / parking lot; for site work for a road / highway; and for paving for a road / highway.

Removal and replacement of deteriorated asphalt, installation of concrete sidewalk, curb and gutter, including subgrade preparation, mill with overlay, and site restoration. Question Deadline 09/17/2026 at 10:00 AM MT Written Questions submitted via email to: Cortlyne.huppe@florencecolorado.org The City of Florence, Colorado is accepting sealed bids from qualified civil construction contractors for the Sunny Side Street, Curb, and Gutter Improvements Project. The work to be performed under this Contract consists of furnishing all plant, labor, equipment, materials, traffic control, site safety, and supervision necessary for: demolition and removal of existing damaged asphalt pavement and concrete curb and gutter; unclassified site excavation, earthwork, and subgrade scarification, moisture conditioning, and compaction; installation and compaction of Class 6 Aggregate Base Course; reconstruction of concrete curb and gutter, driveway aprons, and ADAcompliant sidewalk curb ramps; Hot Mix Asphalt (HMA) paving, compaction, and utility structure adjustments to finished grade; and construction layout, surveying control, stormwater pollution prevention, and complete site restoration. All work shall be performed in strict compliance with the project specifications, construction drawings, applicable local codes, the City of Pueblo Street Standards (latest adopted edition), and/or the Colorado Department of Transportation (CDOT) Standard Specifications for Road and Bridge Construction, all of which are incorporated herein by reference.

GC Bidding

$1,100,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
29
Bidding Soon
432
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2026

November 22, 2026

Project location map

Sunnyside St, Florence, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.