BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2026 at 8:00 PM

Updated September 25, 2026

Demolition, paving and renovation of a sidewalk / parking lot in Altamont, Illinois. Completed plans call for the demolition of a sidewalk / parking lot; and for the renovation of a sidewalk / parking lot.

Removal and replacement of approximately 1003 square feet of sidewalk and installation of 632 square feet of new sidewalk. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. SCOPE OF WORK TO BE PERFORMED FOR LOCATIONS LISTED Provide all labor, materials, equipment, transportation and other costs associated with completion of replacement and installation of indicated sidewalk areas. Ensure sidewalk installation is compliant with current ADA regulations. Provide substantial protection to the structure of the Altamont Library. Coordinate library building drain replacement and concrete removal with the City employees. Daily removal of debris from work area prior to leaving the work area For sidewalk replacement in the 100 block of North Third Street and installation of new sidewalk in the 1st block of West Lincoln Avenue

Sub-Bidding

$25,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
58
Bidding Soon
827
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

October 30, 2026

Project location map

202 North Second Street, Altamont, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.