BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2026 at 7:00 PM

Updated January 29, 2026

Site work for a water / sewer project in Lincoln, Maine. Completed plans call for site work for a water / sewer project.

The goals for this project are a minimum of 0.64% certified Minority Business Enterprise (MBE) and a minimum of 1.64% certified Women's Business Enterprise (WBE) participation. Question Deadline 02/05/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows Rick Pershken, Project Manager Dirigo Engineering 2 Dirigo Drive Fairfield, ME 04937 207-453-2401 rick@dirigoeng.com Questions received less than seven days prior to the date for opening of Bids may not be answered. The project consists of the installation of approximately 225 linear feet of 12-inch diameter ductile iron water main, 1,425 linear feet of 8-inch diameter ductile iron water main, 1,225 linear feet of 6-inch diameter ductile iron water main, hydrants, gate valves, and water services. Water main materials as specified in the contract documents will be provided by the owner. Most materials will be supplied by the owner and installed by the contractor, and costs for materials supplied by the owner are not included in the bid estimate. The expected duration of the project is 150 days. Bidders must provide a bid security of 5% of the total bid price, and payment and performance bonds at contract signing. Bidders must comply with the Build America, Buy America Act, American Iron and Steel Act, Disadvantaged Business Enterprise requirements, nondiscrimination in employment and labor standards, Davis-Bacon wage rates, federal requirements including Copeland "Anti-Kickback" Act, Contract Work Hours and Safety Standards Act, Occupational Safety and Health Standards, Clean Air Act, Clean Water Act, Safe Drinking Water Act, Executive Order 11738, Environmental Protection Agency regulations, Federal Water Pollution Control Act, Rehabilitation Act, Civil Rights Act, Age Discrimination Act, Uniform Relocation and Real Property Acquisition Policies Act, and all permits and restrictions issued for the project by Federal Cross-Cutting Authorities. Further requirements for bid submittal, qualifications, procedures, and contract award are outlined in the bidding documents.

GC Bidding

Water / Sewer

$825,000.00

Public - City

Site Work

9

14

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
21
Bidding Soon
192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

March 16, 2026

Project location map

Katahdin Ave Spring St and Grindle St, Lincoln, ME


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.