Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 8, 2025 at 8:00 PM
Updated October 9, 2025
Site work, paving and renovation of a bridge / tunnel in Redwater, Alberta. Working plans call for the renovation of a bridge / tunnel.
Replacement of the Hwy 38 bridge (BF 74233) carrying Hwy 38:10 over the North Saskatchewan River (13 km SE of Redwater) - a vital transportation corridor in Alberta's Industrial Heartland. The new Vinca route will extend from Edmonton to Tofield, Chipman, Lamont and north on 830 to Redwater. The new heavy-haul bridge will be able to handle loads greater than 200 tonnes, the necessary river-crossing capacity to support future industrial developments. Work includes replacement of BF 74233, realignment of Highway 38 (38:10: C1 KM 17.300 AND KM 22.680), and Highway 830 (830:04: C1 KM 11.330 AND KM 12.538). Project will include additional construction on Highways 38 and 830, and the widening of Highways 834 and 644. TIMELINE: Project is currently included in the 3-year construction program. Tender and construction schedules are yet to be determined. Further update may be available in 2026. *Construction budget to be confirmed. The value listed reflects the $90-million provincial funding announced for the project in AB budget 2018.
Final Planning
Bridges / Tunnels
$90,000,000.00
Public - State/Provincial
Paving, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2026
AB-38, Redwater, AB
Related To This Project
Redwater, AB
Bid Date: Sep 30 2021
Redwater, AB
Bid Date: May 19 2023
Redwater, AB
Bid Date: Mar 14 2019
Redwater, AB
Bid Date: Sep 15 2017
Redwater, AB
Bid Date: Nov 20 2020
Redwater, AB
Bid Date: Apr 22 2021
Redwater, AB
Bid Date: Jun 20 2024
Redwater, AB
Bid Date: Jul 09 2024
Redwater, AB
Bid Date: May 27 2022
Redwater, AB
Bid Date: Jul 19 2023
Redwater, AB
Bid Date: Oct 26 2021
Cold Lake, AB
Bid Date: Sep 20 2022
Edmonton, AB
Bid Date: Aug 09 2022
Leduc, AB
Bid Date: Aug 09 2022
Westlock, AB
Bid Date: Aug 09 2022
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
