BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a bridge / tunnel in Redwater, Alberta. Design plans call for the renovation of a bridge / tunnel.

Replacement of the Hwy 38 bridge (BF 74233) carrying Hwy 38:10 over the North Saskatchewan River (13 km SE of Redwater) - a vital transportation corridor in Alberta's Industrial Heartland. The new Vinca route will extend from Edmonton to Tofield, Chipman, Lamont and north on 830 to Redwater. The new heavy-haul bridge will be able to handle loads greater than 200 tonnes, the necessary river-crossing capacity to support future industrial developments. Work includes replacement of BF 74233, realignment of Highway 38 (38:10: C1 KM 17.300 AND KM 22.680), and Highway 830 (830:04: C1 KM 11.330 AND KM 12.538). Project will include additional construction on Highways 38 and 830, and the widening of Highways 834 and 644. TIMELINE: Project is in design. Tender and construction timelines are yet to be determined, pending capital funding and owner's final plans. Further update may be available in 2024. *Construction budget to be confirmed. The value listed reflects the $90-million provincial funding announced for the project in AB budget 2018.

Design

Bridges / Tunnels

$90,000,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
33
Bidding Soon
547
All Active Projects
179
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 18, 2025

November 20, 2026

img_map_placeholder

AB-38, Redwater, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.