BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2025 at 8:00 PM

Updated August 21, 2025

Site work and paving for a road / highway in Portland, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Portland Bureau of Transportation (PBOT) will construct safety improvements along NE Halsey Street between 68th and 92nd avenues. Includes crossing improvements, new sidewalks, upgraded curb ramps, protected bike lanes, and more. Project Components: - Build new sidewalks on the north side of NE Halsey Street between 85th and 92nd avenues - Improve pedestrian and bicycle infrastructure between NE 80th and 92nd avenues, including: Two-way buffered bike lanes from NE 80th Avenue to Jonesmore Street Two-way buffered bike lanes on the south side of NE Halsey Street between Jonesmore Street and 92nd Avenue. - Improve existing multiuse path from the NE 82nd Avenue MAX station to 81st Avenue - Improve crossings where NE Halsey Street intersects: 68th/69th Avenue 80th Avenue Jonesmore Place/84th Avenue 88th Avenue - Upgrade curb ramps to comply with the Americans with Disabilities Act (ADA) - Improve bus stops - Conduct analysis on street lighting and add additional lighting if needed Project is included in City of Portland - Planning and Sustainability Fiscal Year 2025-2027. As of August 20, 2025, construction mid-July 2025-July 2026. This project will provide buffered bike lanes, a separated multi-use path, and crossing improvements along NE Halsey between 65th and 92nd. Design will begin in 2020; construction is planned for 2022. The project is funded by TSDCs and a federal grant awarded through the Metro 2019-21 grant process. As of August 05, 2021 no new CIP issued, this project is currently in the FY 2020-2024 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Roads / Highways

$8,646,720.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
45
Bidding Soon
1,027
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.