BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2020 at 8:00 PM

Updated February 20, 2025

Site work and paving for a civil project in Ivanhoe, Texas. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

The Project provides for roadway improvements on 16th Street, 17th Street, 19th Street and Lakeview Circle totally approximately 5,600 linear feet of roadway. Bids are for several items and quantity of work as follows: Base improvements including pulverizing, regrading, shaping and compacting Construction of 2" flexible base, placing and compacting Construction of single-course chip seal surface Storm cross culvert replacements Roadside ditch shaping and grading The deadline to ask questions is 7/01/2020 5:00 PM CST SCOPE OF WORK This contract shall provide for the construction of approximately 5,600 linear feet of roadway improvements on 16th Street, 17th Street, 19th Street and Lakeview Circle. The roadway improvements shall be constructed under the oversight of a project licensed official. Project inspection, monitoring, and oversight will be provided by the Project Engineer. The City of Ivanhoe and Tyler County may perform project inspection at any time on any portion of the project. This contract shall include all necessary superintendence, labor, materials, equipment, tools, cleaning, grouting, excavation, trenching, shoring, fill, grading, backfill, surface restoration, testing, hauling and disposal of excess soils to an owner approved site, and incidental items necessary for the construction of the proposed facilities as shown in the drawings and documented in the specifications. All work will be performed in strict accordance to the rules, regulations, and permits of the Texas Commission on Environmental Quality. The Contractor isresponsible for the restoration of all disturbed surfaces, including pavement. All surfaces shall be returned to original condition or better. In general, all restoration shall be completed before beginning work on the next segment of line, according to the plans and specifications. The Contractor shall be responsible for the testing of each system embraced in this Contract. All systems shall be demonstrated to be functioning at design conditions prior to being considered complete. Where requested or required by the Engineer, the Contractor shall submit test data and certify in writing that the systems tested performed as required by the plans and specifications at design conditions. SUMMARY OF WORK This contract shall include, but not be limited to, the following: 1) Mobilization 2) Base improvements including pulverizing, regrading, shaping and compacting 3) Construction of 2” flexible base, placing and compacting 4) Construction of single-course chip seal surface 5) Storm cross culvert replacements 6) Roadside ditch shaping and grading

Award

Roads / Highways

$269,630.00

Public - County

Paving, Site Work

22

1

6

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
24
Bidding Soon
1,963
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2020

August 12, 2020

Project location map

To Be Determined, Ivanhoe, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.