BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2021 at 8:00 PM

Updated June 14, 2025

Site work for a water / sewer project in Vernon Hills, Illinois. Completed plans call for site work for a water / sewer project.

**As of March 15, 2021, this project has not yet been awarded. The project is expected to be awarded on April 13, 2021 County Board Meeting. Project consists of replacement of 8", 10", and 12" DIP water main with 8" C900 DR18 PVC and 8" C900 DR14 PVC by both of open-cuts and horizontal directional drilling. Additionally, the project consists of direct connections to buildings as well. The total length of the water main to be replaced is approximately 2,065 lineal feet. Plan to Mitigate COVID-19 Risk During Site Visits Project: Hawthorn Hills Square Watermain Replacement Project #: PW2020.033 Bid #: 20194 Site Visits (mechanical/sprinkler rooms): 10:00 AM - 2:00 PM on February 8, 2021 1. Each prospective bidder is limited to a maximum of two representatives. 2. Masks are required at all times when outside of a vehicle. 3. All people on site shall maintain a 6-foot distance from each other. 4. Each prospective bidder will have 15 minutes in each mechanical/sprinker room. Please contact Ying Miao, Lake County Public Works, at 847-377-7149 for questions regarding the site visit. 5. A COVID-19 questionnaire will be e-mailed to each prospective bidder when they wish for the site visit. The completed questionnaire is to be e-mailed to Ying Miao (ymiao@lakecountyil.gov) by 7:00 AM February 8. 6. No appointment is needed for visiting outside of the mall building. 7. LCPW personnel will not attend the site visit due to the COVID 19. 8. LCPW personnel and Mall Management cannot answer any questions from the contractor or provide any information related to the project. 9. Contractor can ask questions at the Pre-bid Meeting or can submit questions to Lake County Purchasing as noted in Article 7 of the Instructions to Bidders. Questions Due Date/Time: 02/19/2021 5:00 PM, CST

Award

Water / Sewer

$555,998.00

Public - County

Site Work

14

1

5

14

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
293
Bidding Soon
3,808
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2021

May 3, 2021

Project location map

700 N Milwaukee Ave, Vernon Hills, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.