BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Davenport, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project work includes the furnishing of all labor, materials, equipment, and services necessary for the Hillandale Road and Northwest Boulevard, and W 76 th Street and Northwest Boulevard intersection improvement. The work on Hillandale Road and Northwest Boulevard intersection involves the widening of the west approach (83 rd St) to add a dedicated left-turn lane, the removal and installation of the eastbound traffic signal pole and mast arm, and the installation of additional left-turn signal heads on all four pole, and other related construction. The work on W 76 th Street and Northwest Boulevard involves the complete reconstruction of the west approach, including the addition of a dedicated left-turn lane, removal of the median and the construction of a new access to the business on the south (gas station, McDonald's), and installation of a traffic signal, and other related construction. It is recommended that Contractors become familiar with existing site conditions prior to bidding. The City reserves the right to reject any or all bids and to waive technicalities and irregularities, if it is deemed in the public interest to do so. For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the "Response Attachments" tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. For awarded bids over $100,000, the awarded contractor will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract amount, and said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. Working Days - The City Council is expected to approve award of the contract on January 12, 2022. Contractor shall be prepared to attend a Pre-Construction meeting after the contract is awarded and before the start of the construction. The execution of contract documents shall be expedited to allow for an expected project start during the week of April 4, 2022. The Contractor will be required to have the project substantially completed by July 1, 2022. Substantial completion shall include all project work including pavement marking and fully operational traffic signals, with the exception of project seeding, which may be delayed due to application restrictions.

Award

Roads / Highways

$1,016,631.00

Public - City

Paving, Site Work

58

7

6

4

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
57
Bidding Soon
1,055
All Active Projects
424
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 6, 2021

April 4, 2022

July 1, 2022

img_map_placeholder

Multiple Locations, Davenport, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.