BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Norman, Oklahoma. Completed plans call for site work for a water / sewer project.

This project will replace 5,000 feet of 12-inch waterline and 1,500 feet of 8-inch waterline from Alameda Street to Robinson Street on Porter Avenue. Bidders are expected to inspect the site of the work and to inform themselves regarding all local conditions. Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted. If sent by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as stated above. All blank spaces for bid prices must be filled in, in ink or typewritten, and in both words and figures. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for opening the bids, as well as bids received after the time set for receipt of bids, WILL NOT be considered and will be RETURNED UNOPENED. A cashier's check, a certified check, or a surety bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to the unsuccessful bidders. Each bid submitted is a legal offer and when accepted by the NUA, constitutes a FIRM AND BINDING CONTRACT. The OWNER reserves the right to REJECT ANY or ALL BIDS. The OWNER further reserves the unconditional right to cancel all or any portion of this project within sixty (60) days from the date of opening of bids, for any reason and at its sole discretion. The Norman Utilities Authority (NUA) is exempt from the payment of any sales or use taxes. Pursuant to Title 68 O.S., Section 1356 (10) and as allowed by Oklahoma Tax Commission Rules Part 27 Trust Authority 710:65-13-140, direct vendors to the NUA are also exempt from those taxes. A bidder and his subcontractors may exclude from their bid sales taxes on appropriate equipment, materials, and supplies incorporated into the project and purchased by the NUA through the bidder. The bidder and his subcontractors will coordinate such purchases with the NUA. Questions concerning the bid or project requirements should be directed to Sean Price, PE at SCPrice@GarverUSA.com

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
48
Bidding Soon
694
All Active Projects
302
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 3, 2022

March 7, 2022

July 15, 2022

img_map_placeholder

N Porter Ave, Norman, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.