Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in East Greenville, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
This project will consist of excavation and removal of old roadway and subgrade, installation of new 6" 2A stone subbase, 5" of 25 mm asphalt base course, and 1-1/2" 9.5 mm asphalt wearing course. Also included will be replacement of 10 ADA ramps, 2 driveway aprons and 92 S.F. of sidewalk with associated curb. Items for tack coating, adjustment of utilities and joint sealing around curbs, manholes, inlets, and valve boxes will be incidental to the project. Excavate and remove old roadway and subgrade. Install new 6" PennDOT 2A stone subbase. Provide and install frame adjustment rings on all utility boxes, as required. Placement of Superpave, WMA, 25 mm base course. Placement of Superpave, WMA, 9.5 mm wearing course. Replacement of select sections of curb and sidewalk. Replacement of ADA ramps. Installation and maintenance of traffic barriers and controls. Providing flag person(s) as necessary to ensure traffic safety. Sealing of all joints with joint sealer as specified on the plans and within the specifications Attention is called to the fact that not less than the minimum salaries and wages are set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated because of their race, color, religion, sex or national origin. The Borough of East Greenville reserves the right to reject any or all Bids or to waive any informalities or irregularities in the bidding when, in the opinion of the Borough, such rejections or waivers shall be to its interest or advantage. CLARIFICATION DEADLINE 2/21/2022 10:00 AM
Bid Results
Roads / Highways
$203,459.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2022
April 1, 2022
Cherry St, East Greenville, PA
Related To This Project
East Greenville, PA
Bid Date: Oct 24 2019
East Greenville, PA
Bid Date: Apr 23 2019
East Greenville, PA
Bid Date: Feb 12 2024
East Greenville, PA
Bid Date: Sep 03 2024
East Greenville, PA
Bid Date: Sep 27 2023
East Greenville, PA
Bid Date: Sep 22 2023
East Greenville, PA
Bid Date: Aug 28 2023
East Greenville, PA
Bid Date: Jul 05 2023
East Greenville, PA
--
East Greenville, PA
Bid Date: Dec 21 2022
East Greenville, PA
--
East Greenville, PA
Bid Date: Apr 06 2022
East Greenville, PA
Bid Date: Jan 12 2022
East Greenville, PA
Bid Date: Sep 21 2018
East Greenville, PA
Bid Date: Sep 22 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.