EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Freeland, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Bid estimate is $435,600.00 with Freeland Borough being able to pick and chose what parts of project they will do. CLARIFICATION DEADLINE 3/9/2022 3:00 PM Inquiries regarding this contract must be uploaded prior to March 9, 2022 at 3 pm.The bids must be completed on the site and include a 10% Bid Bond made payable to Freeland Borough including Surety's Consent by a firm licensed to conduct business in Pennsylvania. Performance and Payment Bonds are required and the successful bidder is required too submit E-Verify form with the contract. No Bid may be withdrawn for a period of 60 calendar days following Bid opening. Each bid shall be accompanied by a certified or cashier's check or Bid bond in the amount of 10% of the total bid price, payable to Freeland Borough, as a guarantee that the Bidder, if its Bid is accepted, shall promptly obtain the required Bonds and Insurance and shall prepare the required submittal documents and execute the Agreement. Freeland Borough reserves the right after opening Bids to reject any or all Bids. Or to waive any informality or to award a portion of the project. Bidders shall comply with the Public Works Employment Verification Act and Luzerne County Community Development Bid Documents which are a part of this bid.

Bid Results

Roads / Highways

$168,620.00

Public - City

Paving, Site Work

15

25

2

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
123
Bidding Soon
1,738
All Active Projects
840
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2022

April 15, 2022

img_map_placeholder

Multiple Locations, Freeland, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Freeland Borough Double Chip Seal Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.