BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in La Jolla, California. Completed plans call for the renovation of a educational facility.

**As of 3/18/2022 Project The project listed is currently in the prequalification process. No awarded contractor yet. The project includes installation of approximately twenty (20) new high temperature water (HTW) valves (size ranging from 4" to 16") in various vaults, walkable underground tunnels, and manholes throughout the School of Medicine on the west campus. The scope includes: replacement of 16" segmentation plug valves on the HTW main distribution loop and 8" branch valves in the same vault. replacement of valves in various other locations to support the primary work, replacements for failed valves and new bypass piping, valves, and ball joints to minimize HTW service disruption to key facilities within the area, and construction of a small segment of new 6" direct-buried, encased bypass piping to connections in a nearby vault and furnish and facilitate operation of trailer-mounted temporary medium-temperature (200F) boilers at least at one building to maintain HVAC heating during related HTW branch valve replacements. The project may require construction of a small segment of utilidor to support the HTW bypass. The construction must commence and be completed within the summer of 2022. The Contractor shall have demonstrated an average annual business revenue of at least $5,000,000 over the last five (5) consecutive years. The Contractor must have demonstrated experience on their best three (3) comparable projects with the Contractor providing services as General Building Contractor and Warm-Air Heating, Ventilating and Air-Conditioning Contractor within the last ten (10) years. Projects should have possessed the following construction challenges: Urban site work with limited construction space and staging areas; repairs, renovations/expansions of existing systems requiring proactive and innovative solutions due to noise/vibrations; repairs, renovations/expansions of existing systems requiring proactive and innovative solutions in order to avoid or minimize service disruptions to active facilities, multiple depressurization and draining outages for large main HTW loop. UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Women-owned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE's) and is committed to promote a diverse pool of firms for our building programs. Potential bidders will be required to submit their small business outreach plan to the University as part of the prequalification process. No Prequalification Questionnaire will be received after 4:00 P.M., THURSDAY, MARCH 03, 2022 Estimated Project duration: 90 calendar days. . The construction must commence and be completed within the summer of 2022.

Post-Bid

Educational

$1,300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
47
Bidding Soon
1,177
All Active Projects
513
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2022

July 11, 2022

img_map_placeholder

9500 Gilman Dr, La Jolla, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.