Site work and paving for a mixed-use development in Mifflinburg, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of June 1, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. The extensions will consist of approximately 1,900 linear feet of 8-inch gravity wastewater collector, approximately 1,200 linear feet of 10-inch gravity wastewater collector, 200 feet of 4-inch gravity lateral, 1,300 feet of 2-inch and 1 1/4 -inch pressure force main, 8 manholes, 2 cleanouts, 3 single-residence grinder pump stations, paving and surface restoration, Erosion and Sediment Pollution controls, etc. Approximately 800 feet of sewer will involve digging up existing sewer line and 2 manholes and replacing with deeper collector pipe and manholes. Bidders must provide with their Proposal (or Bid) either a certified bank treasurer's check, a certified cashier's check payable to the order of Lewis Township Supervisors or a bid bond in the amount of ten percent (10%) of the bid. Bidders must also provide with their Proposal a fully completed Non-Collusion Affidavit and a Public Works Employment Verification Form. The two apparent low bidders will be required after bids are opened to provide proof of prior experience and adequate resources to complete the project. The successful low bidder will be required to furnish fully executed original Proposal (or Bid) forms. Failure to fully comply with all bid requirements including but not limited to the above will be cause to reject a bid. Bidders are advised that PA Prevailing Minimum Wage Rates are incorporated in the Contract Documents and must be paid to all workers employed at the construction site. Lewis Township may hold all Bids and they shall remain irrevocable for 120 days from the Bid Opening date, which includes 60 days that may be needed to secure funding. The Township reserves the right to accept or reject any or all bids, waive any informalities or irregularities, or negotiate contract amounts. The successful Contractors will be required to furnish upon Contract Award a Performance Bond and a Payment Bond, each for one hundred (100%) percent of the contract price as bid. CLARIFICATION DEADLINE 1/18/2023 4:00 PM

Award

Water / Sewer

$647,898.00

Public - City

Paving, Site Work

24

19

8

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
61
Bidding Soon
695
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2023

February 22, 2023

img_map_placeholder

Multiple Locations, Mifflinburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Collection System Extensions

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.