BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, paving and new construction of a bridge / tunnel in Redding, California. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the construction of a bridge / tunnel; and for the demolition of a bridge / tunnel.

The bridge is located approximately one-tenth of a mile south of Canyon Creek Road and carries Westside Road which is classified as a major urban collector. The Project includes (quantities are approximate), replacing the existing bridge with an 84-feet-long, 3-Span, Cast-In-Place Reinforced Concrete Slab Bridge with an ultimate width of 41-feet. The bridge work includes removal of the existing bridge, 1,450-feet of 30-inch cast-in-drill-hole (CIDH) concrete piles, 444 cubic yards(cy) of structural concrete, 122,000 lbs of bar reinforcing steel, 331 cy of structure excavation, 140 cy of structure backfill, 124-feet of concrete barrier (type 732SW), 114-feet of concrete barrier (type 836), tubular handrailing and tubular bicycle railing, 20-inch ductile iron pipe, REU electrical conduits, 2" PGE gas, and 138 cy of rock slope protection. The road work includes 700 cy of roadway excavation, 900 tons of asphalt concrete, 500 cy of aggregate base, 100 cy of minor concrete, 62-feet of Midwest Guardrail, 230-feet of 20-inch DIP, removal of existing asbestos cement pipe, 230-feet of chain like fence, 1,300-feet of temporary railing, signs and striping. There will be four primary stages of construction including the bridge replacement and road approach work using typical half-width construction methods. The current construction cost estimate, not including contingencies or construction management, is about $3.3 million. The will be 220 working days for construction of the Project. The cut-off date and time for receiving questions regarding this bid is 5:00 p.m. PT, on Friday, November 22, 2024. Addendum issued (if necessary) November 27, 2024 Begin Construction - July 2025 End Construction - October 2026

GC Bidding

Bridges / Tunnels

$3,300,000.00

Public - City

Demolition, New Construction, Paving, Site Work

3

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
4
Bidding Soon
71
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

July 1, 2025

img_map_placeholder

Westside Rd, Redding, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.