Site work and paving for a mixed-use development in Burlington, Vermont. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The scope of the work consists of repairs and improvements along Church Street; at the intersection of Church St & College St, the intersection of Church St & Bank St, and the globe paver installation on Church St between Main St and College St. Work at Church St & College St consists of the installation of granite detectable warning pavers along intersection edges, replacing the brick crosswalks, granite curb crosswalk edges, brick pavers within intersection, subbase materials, with full depth bituminous pavement sections matching into existing pavement on both ends. Work at Church St & Bank St consists of the installation of granite detectable warning pavers along the intersection edges. Work at the globe paver installation on Church St between Main St and College St consists of replacing the existing globe pavers and granite line inlays in kind, as well as surrounding brick pavers within the adjacent granite line inlay, replacing two earthline city markers in kind, removing and resetting existing plaques, and grinding the edge of concrete sidewalk. Add Alternate No. 1 consists of removing three abandoned tree pits along Church Street, installing base and subbase materials, bituminous base and setting beds, and brick pavers matching into the surrounding grades and matching the colors and pattern of surrounding pavers. Add Alternate No. 2 consists of removal and replacement of brick pavers at spot locations exhibiting damaged, missing, and/or settled pavers, replacing base and subbase materials, as well as brick pavers matching into the surrounding grades and matching the colors and pattern of surrounding pavers. CONTRACT START DATE: Work shall not begin prior to March 1, 2024. CONTRACT COMPLETION DATE: The Contract shall be completed on or before November 22, 2024. Work continued after November 22, 2024 shall be subject to accrue liquidated damages as set forth by the GENERAL PROVISIONS of the City of Burlington VT 2023 Engineering Specifications. ENGINEERS ESTIMATE: The Engineers Estimate of the base bid for this Proposal is $500,000- $1,000,000. For City of Burlington, prequalification shall be submitted by interested Bidders a minimum of 5 days before the Bid Due Date unless they are already qualified with the City of Burlington under a prior project. A Prequalification Application is included with these Bid Documents. Please contact the MPM for questions. For VTrans qualification questions, please contact VTrans Contract Administrator Jon Winter at 802- 622-1267. The general contractor superintendent shall attend bi-weekly construction progress meetings with City representatives. The design team and construction subcontractors shall be involved in these meetings as necessary and requested. The general contractor shall prepare an updated construction schedule documenting the upcoming construction activities. The City shall be responsible for securing a meeting location and preparing all meeting materials, notes, and action items. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions must be submitted before January 22nd, 2024 at 5:00 pm. Questions received after this time may not be answered. Any revisions, addendums and answers to questions received by the due date for questions will be sent to bidders who received this Invitation via email.
Award
Roads / Highways
$905,870.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2024
March 1, 2024
Church St, Burlington, VT
Related To This Project
Burlington, VT
--
Burlington, VT
Bid Date: Jan 04 2024
Burlington, VT
Bid Date: Jan 03 2024
Burlington, VT
Bid Date: Jan 24 2024
Burlington, VT
Bid Date: Mar 20 2024
Burlington, VT
--
Burlington, VT
Bid Date: Nov 13 2023
Burlington, VT
--
Burlington, VT
Bid Date: Oct 13 2023
Burlington, VT
Bid Date: Sep 29 2023
Burlington, VT
--
Burlington, VT
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.