BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Burlington, Vermont. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The scope of the work consists of repairs and improvements along Church Street; at the intersection of Church St & College St, the intersection of Church St & Bank St, and the globe paver installation on Church St between Main St and College St. Work at Church St & College St consists of the installation of granite detectable warning pavers along intersection edges, replacing the brick crosswalks, granite curb crosswalk edges, brick pavers within intersection, subbase materials, with full depth bituminous pavement sections matching into existing pavement on both ends. Work at Church St & Bank St consists of the installation of granite detectable warning pavers along the intersection edges. Work at the globe paver installation on Church St between Main St and College St consists of replacing the existing globe pavers and granite line inlays in kind, as well as surrounding brick pavers within the adjacent granite line inlay, replacing two earthline city markers in kind, removing and resetting existing plaques, and grinding the edge of concrete sidewalk. Add Alternate No. 1 consists of removing three abandoned tree pits along Church Street, installing base and subbase materials, bituminous base and setting beds, and brick pavers matching into the surrounding grades and matching the colors and pattern of surrounding pavers. Add Alternate No. 2 consists of removal and replacement of brick pavers at spot locations exhibiting damaged, missing, and/or settled pavers, replacing base and subbase materials, as well as brick pavers matching into the surrounding grades and matching the colors and pattern of surrounding pavers. CONTRACT START DATE: Work shall not begin prior to March 1, 2024. CONTRACT COMPLETION DATE: The Contract shall be completed on or before November 22, 2024. Work continued after November 22, 2024 shall be subject to accrue liquidated damages as set forth by the GENERAL PROVISIONS of the City of Burlington VT 2023 Engineering Specifications. ENGINEERS ESTIMATE: The Engineers Estimate of the base bid for this Proposal is $500,000- $1,000,000. For City of Burlington, prequalification shall be submitted by interested Bidders a minimum of 5 days before the Bid Due Date unless they are already qualified with the City of Burlington under a prior project. A Prequalification Application is included with these Bid Documents. Please contact the MPM for questions. For VTrans qualification questions, please contact VTrans Contract Administrator Jon Winter at 802- 622-1267. The general contractor superintendent shall attend bi-weekly construction progress meetings with City representatives. The design team and construction subcontractors shall be involved in these meetings as necessary and requested. The general contractor shall prepare an updated construction schedule documenting the upcoming construction activities. The City shall be responsible for securing a meeting location and preparing all meeting materials, notes, and action items. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions must be submitted before January 22nd, 2024 at 5:00 pm. Questions received after this time may not be answered. Any revisions, addendums and answers to questions received by the due date for questions will be sent to bidders who received this Invitation via email.

Award

Roads / Highways

$905,870.00

Public - City

Paving, Site Work

18

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
77
Bidding Soon
1,310
All Active Projects
511
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

March 1, 2024

img_map_placeholder

Church St, Burlington, VT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.