Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 6, 2025 at 8:00 PM
Updated August 7, 2025
Renovation of a water / sewer project in Findlay, Ohio. Conceptual plans call for the renovation of a water / sewer project.
Update:Currently the WTP has two diesel generators that power the treatment plant in the event of a power failure. Due to the age of the generator they cannot fully run in sync with each other and it causes the generators to lose power when they are running. Since the generator is used for an emergency basis it is desired to replace the duel generators with one new generator that can power the whole plant and still have capacity for future expansion. As part of this project, a new diesel generator will be purchased and installed along with a new automatic transfer switch that will allow the generator to power up in the event of a power loss. The current lead time for a new diesel generator is 95-98 weeks. Project is included in City of Findlay Fiscal Year 2025-2034 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE: https://www.findlayohio.gov/home/showpublisheddocument/15685/638471480933900000 Currently the WTP has two diesel generators that power the treatment plant in the event of a power failure. Due to the age of the generator they cannot fully run in sync with each other and it causes the generators to lose power when they are running. Since the generator is used for an emergency basis it is desired to replace the duel generators with one new generator that can power the whole plant and still have capacity for future expansion. As part of this project, a new diesel generator will be purchased and installed along with a new automatic transfer switch that will allow the generator to power up in the event of a power loss. The current lead time for a new diesel generator is 95-98 weeks. Project is in City of Findlay capital budget fy 2024-2033 CIP 154 __________________________________________________________________________________________________________________ Currently the WTP has two diesel generators that power the treatment plant in the event of a power failure. Due to the age of the generator they cannot fully run in sync with each other and it causes the generators to lose power when they are running. Since the generator is used for an emergency basis it is desired to replace the duel generators with one new generator that can power the whole plant and still have capacity for future expansion. As part of this project, a new diesel generator will be purchased and installed along with a new automatic transfer switch that will allow the generator to power up in the event of a power loss. The current lead time for a new diesel generator is 95-98 weeks. The project is include in the city's 2023-2032 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$800,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
11716 Co Rd 40, Findlay, OH
Related To This Project
Findlay, OH
Bid Date: Aug 28 2025
Findlay, OH
Bid Date: Oct 09 2025
Findlay, OH
Bid Date: Sep 09 2025
Findlay, OH
Bid Date: Sep 04 2025
Findlay, OH
Bid Date: Sep 04 2025
Findlay, OH
Bid Date: Sep 04 2025
Findlay, OH
Bid Date: Sep 04 2025
Findlay, OH
Bid Date: Aug 14 2025
Findlay, OH
Bid Date: Aug 13 2025
Findlay, OH
Bid Date: Aug 15 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.