BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2024 at 8:00 PM

Updated May 11, 2024

Site work and paving for a mixed-use development in Normal, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project consists of furnishing all work necessary for the completion of milling and hot mix asphalt overlay and sidewalk improvements, along with necessary incidentals, on Adelaide Street in the Town of Normal, Illinois. The proposed improvement consists of the following approximate quantities: 10,932 SY Hot-Mix Asphalt Surface Removal; 83 SY Full Lane Sealant Waterproofing Membrane; 400 SY Class B Patches; 800 SY Class D Patches; 7,500 pounds Bituminous Materials (Tack Coat); 3,100 feet Longitudinal Joint Sealant; 95 tons Polymerized HMA Binder Course, IL-4.75, N50; 766 tons Polymerized HMA Binder Course, IL-9.5FG, N90; 919 tons Polymerized HMA Surface Course, SMA, 9.5, Mix E, N80; 3,100 SF Excavation for Sidewalk Widening; 8,300 SF Sidewalk Removal; 11,200 SF PCC Sidewalk, 6"; 265 SF PCC Sidewalk, 8"; 200 feet Side Curb for ADA Ramps; 525 feet Barrier Yard Curb, Special; 190 SF Detectable Warnings; 65 feet Remove and Re-erect Iron Fence; 1,100 feet Combination Curb and Gutter Removal; 1,100 feet Combination Concrete Curb and Gutter, Type B-6.18, Special; 1,200 feet Combination Concrete Curb and Gutter, Removal and Replacement, Special; adjustment or replacement of 36 gas, water, or sewer structures; 11,000 feet Short-term Pavement Markings - Paint; 2,900 feet Short-term Pavement Markings - Tape; 250 SF Paint Pavement Marking - Letters and Symbols; 6,800 feet Paint Pavement Marking - Line 6"; 950 feet Paint Pavement Marking - Line 12"; 175 feet Paint Pavement Marking - Line 24" ; and all other necessary items and incidentals required to complete this project according to the plans and specifications. This is a prevailing-wage project. The Town reserves the right to reject any or all bids received. The bid award will be made by the Town Council, and the decision of the Council will be final.

Post-Bid

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

58

4

2

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
71
Bidding Soon
1,188
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

June 7, 2024

Project location map

N Adelaide St, Normal, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.