Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 14, 2025 at 7:00 PM
Updated February 15, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Ste Agathe, Manitoba. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The Work to be done under this Contract shall consist of major rehabilitation of components related to the superstructure, substructure, embankments, and approaches of the existing bridge on PR 305 over the Red River. Rehabilitation elements include, the demolition and replacement of the existing bridge, substructure and foundations modifications and concrete repairs, fabrication and erection of new steel girders and bridge bearings, construction of new concrete bridge deck, approach guardrail and roadway modifications, utility relocation/accommodation, embankment modification, and erosion control work. The structure crosses the Red River, near St. Agathe, Manitoba on PR 305, Site No. 3051-00. The Contract Will Be Assessed Liquidated Damages in Accordance With the Provisions for Liquidated Damages - Completion Specified by Completion Date. Subcompletion 1 Substructure Modifications, Stage 1a and Stage 1 Construction Shall Be Completed by October 30, 2025. Daily Liquidated Damages After the Sub-completion Date 1 Will Be Charged to the Contractor at the Rate of Five Thousand ($5,000.00) Dollars Per Calendar Day Until the Work is Completed. Subcompletion 2 Stage 2, Stage 3 and Opening of Pr 305 and the New Bridge to Normal Traffic Shall Be Completed No Later Than September 1, 2026. Daily Liquidated Damages After the Sub-completion Date 2 Will Be Charged to the Contractor at the Rate of Five Thousand ($5,000.00) Dollars Per Calendar Day Until the Work is Completed. Completion Stage and All Remaining Work Including Site Restoration Shall Be Completed by No Later Than November 30, 2026. Daily Liquidated Damages After the Specified Completion Date Will Be Charged to the Contractor at the Rate of Five Thousand ($5,000.00) Dollars Per Calendar Day Until the Work is Completed. The Maximum Liquidation Damage Charged at Any Given Time Shall Be Five Thousand ($5.000.00) Dollars Per Calendar Day Until the Work is Completed. The Seasonal Shutdown Date for Applicable Roadwork is: October 31 of Any Given Year. The Seasonal Shutdown Date for Applicable in-stream Work is: April 1-june 30 of Any Given Year. Question Acceptance Deadline: 2024/06/18 12:00:00 PM CDT Questions are submitted online - No All enquiries regarding the Work may be made to: Adam Brown, EIT Junior Structures Engineer Bridges and Highway Structures Manitoba Infrastructure Phone - (431) 279-1546 Email - adam.brown@gov.mb.ca Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Under Construction
Bridges / Tunnels
$30,209,735.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2024
July 8, 2024
MB-305, Ste Agathe, MB
Related To This Project
Ste Agathe, MB
Bid Date: May 23 2025
Ste Agathe, MB
Bid Date: Feb 13 2024
Ste Agathe, MB
Bid Date: Jan 15 2024
Winnipeg, MB
Bid Date: May 30 2024
Winnipeg, MB
Bid Date: Jun 14 2024
Winnipeg, MB
Bid Date: Jul 26 2024
Winnipeg, MB
Bid Date: Jun 14 2024
Winnipeg, MB
Bid Date: Jun 14 2024
Winnipeg, MB
Bid Date: Jun 14 2024
Winnipeg, MB
Bid Date: Jun 07 2024
Gypsumville, MB
Bid Date: Jun 05 2024
Winnipeg, MB
Bid Date: May 31 2024
Lorette, MB
Bid Date: Jun 04 2024
Lac du Bonnet, MB
Bid Date: Jun 04 2024
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed