BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Fitchburg, Massachusetts. Completed plans call for the renovation of a educational facility.

A. The work under this Section shall include the furnishing of all materials, labor, equipment and supplies and the performance of all operationsto provide complete working systems, in general, to include the following items 1. HVAC Upgrades - Memorial Middle School a. Provide unit ventilators with VRF coil and hot water coil; hot water piping; insulation; valves; automatic temperature controls; and appurtenances indicated on the contract drawingsfor the heating system renovations. VRF coils to remain inactive. b. Provide cabinet exhausters; automatic temperature controls; and appurtenances indicated on the contract drawings for the heating system renovations. c. Provide roof mounted exhaust fans; automatic temperature controls; and appurtenances indicated on the contract drawings for the heating system renovations. d. Electrical: The work under this Section shall include the furnishing of all materials, labor, equipment and supplies and the performance of all operations to provide complete working systems, in general, to include the following items: Raceways and conduit; Panelboards, including circuit breakers; Safety disconnect switches (fused or unfused); Fuses; Cable Supports and Boxes; Junction boxes, Pull boxes and Cable Troughs; Motor connections and controls including the installation of starters provided under Division 23; Wire and cable; Sleeving; Fire seal, (and) fire-proof foam; Supervision and approval; Nameplates, labels and tags; Testing and Operating and maintenance instructions and manuals. The City o Fitchburg is looking for a contractor to complete HVAC Upgrades at Memorial Middle School. The Project consists of but not limited to: installation of new unit ventilators with VRF coils and hot water coils serving classrooms. Construction is anticipated for Summer 2025. Last day for questions FSBs: 06/05/2024 @ 5pm GCs: 06/19/2024 @ 5pm Fitchburg Public Schools: HVAC Upgrades at Memorial Middle School in accordance with MGL c.149. Estimated Cost $1,250,000 Bid Result Painting John W Egan Co Inc-$19,920 HVAC William F Lynch-$1,268,700 Electrical Work Ostrow Electric Company Inc-$36,820

Award

Educational

$1,325,440.00

Public - City

Renovation

59

13

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
156
Bidding Soon
3,046
All Active Projects
1,264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

August 12, 2024

img_map_placeholder

615 Rollstone St, Fitchburg, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.