BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sheboygan Falls, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Resurfacing Will Consist of Approximately 20,221 Sy of Asphaltic Pulverizing, 4,821 Tons of Hot Mix Asphaltic Pavement and Miscellaneous Concrete Curb/gutter Removal & Replacement. Bid Security in the Amount Not Less Than 5% of the Bid Shall Accompany Each Bid. Contract Security : the Bidder to Whom the Contract is Awarded Shall Furnish a Performance Bond and a Payment Bond Each in an Amount Equal to the Contract Price. Owner Reserves the Right to Reject Any and All Bids, Waive Informalities in Bidding or to Accept the Bid or Bids, Which Best Serve the Interests of the Owner. The Owner Reserves the Right to Reduce the Paving Quantities Based on Available Funding. The City of Sheboygan Falls Department of Public Works hereby gives notice that unit price bids will be accepted for the road resurfacing of Wilson Avenue from 300 feet west of 6th Street to Bluebird Lane, Woodview Avenue from Bluebird Lane east to the terminus, Westwood Drive from Western Avenue to Woodview Avenue, Big Bend Lane from CTH PP south to the terminus, Westridge Drive from CTH PP to Partridge Run and the Evans parking lot. The resurfacing will consist of approximately 20,221 SY of asphaltic pulverizing, 4,821 tons of hot mix asphaltic pavement and miscellaneous concrete curb/gutter removal & replacement. Please note that funds appropriated through the Local Road Improvement Program will be utilized to finance the resurfacing of Big Bend Lane This work consists of pulverizing and relaying asphaltic pavement and base course, asphaltic concrete resurfacing, adjusting manholes and water valve boxes and preparation of foundation for asphaltic paving. Work also included is the removal and replacement of concrete curb and gutter. All work shall be performed in accordance with the State of Wisconsin Department of Transportation (WisDOT), Standard Specifications for Highway and Structure Construction, 2018 Edition as herein specified.

Award

Roads / Highways

$551,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
35
Bidding Soon
586
All Active Projects
236
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

July 6, 2024

img_map_placeholder

Multiple Locations, Sheboygan Falls, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.