Published July 11, 2024 at 8:00 PM
Updated July 30, 2024
Site work for a power facility in Newport, Washington. Completed plans call for site work for a power facility.
Bids from prospective distributors for a power transformer for its Bare Mountain Substation. Question Deadline: 07/19/2024 at 2:00 PM PT , All questions or clarifications must be submitted through the Clarifications tab. If you have questions regarding the online please email contracts@popud.org. Questions related to this submittal must be sent via online Responses to these questions will be made available to all bidders via online. Call for Bid Requirements Bid must include a bid bond in the amount equal to five percent (5%) of the maximum bid price. Bid to include Washington State Sales Tax (WSST). Each bid must be accompanied by the following: completed bid form including lead-times; completed proposal data sheets found in section 1.0 of the specifications; and all data requested in section 2.4 of the specifications. Evaluation of the Call for Bid The District will evaluate each submitted bid for completeness. Bid submittals that do not meet the minimum requirements may not be considered. The District reserves the right to reject all submittals, and modify or withdraw the Call for Bid. The District will award the contract to the qualified bidder whose proposal is most advantageous to the District based upon the factors identified below. The District reserves the right to negotiate with the highest scoring bidder/entity. Should the District fail to secure an agreement with the selected entity, the District may elect to pursue an agreement with the next highest scoring entity. The proposals will be evaluated based on cost and as defined by the specifications. The District reserves the right to cancel this Call for Bid at any time, or issue amendments or corrections. The District reserves the right to award this contract, or to not award this contract. Women's, minority, and small business enterprises are encouraged to apply. The District is an equal opportunity employer.
Post-Bid
Power Plant
$520,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2024
August 29, 2024
To Be Determined, Newport, WA
Related To This Project
Newport, WA
Bid Date: Jul 16 2024
Newport, WA
Bid Date: Sep 03 2024
Newport, WA
Bid Date: Sep 11 2024
Newport, WA
--
Newport, WA
Bid Date: Nov 05 2024
Newport, WA
Bid Date: Jan 14 2025
Newport, WA
Bid Date: Feb 25 2025
Newport, WA
Bid Date: Apr 13 2021
Newport, WA
Bid Date: Jun 04 2024
Newport, WA
Bid Date: Apr 23 2024
Newport, WA
--
Newport, WA
Bid Date: Mar 26 2024
Newport, WA
--
Newport, WA
Bid Date: Mar 01 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.