BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Mill Valley, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Molino Avenue Safety Improvements. Project Description: The work generally consists of mobilization, traffic control, roadside concrete swale demolition and removal, installation of new 12" storm drain, installation of 2 drain inlets, modifying 1 existing drainage inlet, installation of new curb & gutter, and patch hot mix asphalt pavement, replace traffic striping, clean-up of the project area, and other items of work as shown on the plans. The project is located near 437 Molino Avenue in the City of Mill Valley. Project is to be completed within Twenty (20) consecutive working days from the effective date of the Notice to Proceed for the base bid. A Bid Bond in the amount of 10% of the total bid amount payable to the City of Mill Valley shall accompany the Proposal. Award of contract, if awarded, will be to the lowest responsible bidder whose proposal complies with prescribed requirements, and will be within thirty (30) days after receipt of proposals. Telephones will not be available to bidders for the preparation of bids or for calling in bid results. Bid forms received after the designated time shall not be accepted. No bidder may withdraw its bid for a period of sixty (60) days after the date set for the opening of bids. PROPOSAL GUARANTY: All bids must be submitted on the proposal Form obtained from the Department of Public Works and shall be accompanied by a Proposal Guaranty of at least ten (10%) of the base bid. Guaranties shall be in the form of cash, a certified or cashier's check or Bid Bond payable to the City of Mill Valley. Failure of the successful bidder to execute and return the contract or to file acceptable bonds, as required, within the time allotted shall be cause for the annulment of the award and forfeiture of the Proposal Guaranty. The Performance Bond shall be in an amount equal to one hundred percent (100%) of the total amount bid by the Contractor in his proposal. The Labor and Materials Bond shall be in an amount equal to one hundred percent (100%) of the total amount bid by the Contractor in his proposal. The City reserves the right to reject any or all bids, and to waive any irregularities in the bids. The proposed scope of work includes installing approximately 201 linear feet of 12in RCP storm drain pipe along Molino Avenue in the City of Milly Valley. As outlined in the schedule of bid items, this work includes, but is not limited to, mobilization, traffic control, installation of new 12in storm drain, installation of 2 new drain inlets, modifying 1 existing drainage inlet, installation of curb & gutter, hot mix asphalt pavement patching, replacing traffic striping, clean up of project area, and other items of work as shown on the Plans, as called for in the Special Provisions, and as directed by the Engineer.

Post-Bid

Roads / Highways

$122,000.00

Public - City

Paving, Site Work

5

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
172
Bidding Soon
3,188
All Active Projects
1,247
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 9, 2024

September 9, 2024

October 2, 2024

img_map_placeholder

Molino Ave, Mill Valley, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.