Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 5, 2024 at 8:00 PM
Updated August 7, 2024
Renovation of an educational facility in Hoyt, Kansas. Completed plans call for the renovation of a educational facility.
Roof Replacement PROJECT DESCRIPTION: Abbreviated written summary: Briefly and without force and effect on Contract Documents, work of Contract can be summarized as follows: Approximate area of High School Roof to be replaced: 19,500 SF. 1) Interior Remodel: None anticipated. 2) Selective Demolition: Minimal anticipated. Existing metal standing seam roof is to remain. 3) New Work: New work includes new TPO membrane roof system. The new TPO membrane system shall include new rigid flute filler roof insulation board and 1/2 i coverboard. Work will include roofing membrane manufactureris recommended roofing and flashing details to meet roofing membrane manufactureis standards for full warranty. Adjustment of existing roof penetrations will be included to accommodate new roof insulation. 4) Schedule: Intent is to bid and award the contract and develop submittals and place orders for materials in time that work can take place during a period when temperatures are conducive to the proper installation of the new membrane (Fall 2024). There will be substantial use of the adjacent parts of the campus during the work period, however, The District is accommodating their activities to facilitate this work. a) Award: A specific date of substantial completion will be determined upon award of contract Each Bidder shall examine the bidding documents carefully and, not later than five (5) days prior to the date for receipt of bids (August 1, 2024), shall make written request to the Architect for interpretation or correction of any ambiguity, inconsistency or error therein which he may discover. Any interpretation or correction will be issued as an Addendum by the Architect. ONLY A WRITTEN INTERPRETATION OR CORRECTION BY ADDENDUM SHALL BE BINDING
Post-Bid
Educational
$50,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed