Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 13, 2025 at 7:00 PM
Updated January 14, 2025
Site work for a water / sewer project in Mercer Island, Washington. Completed plans call for site work for a water / sewer project.
Engineers Estimated Cost: $3,700,000 to $4,300,000 Work to be performed under this contract includes but is not limited to furnishing all labor, equipment, and materials necessary for constructing: Schedule A: 1 new pressure reducing valve station, 20 LF of new 14-inch DI water main, 4,605 LF of new 8-inch DI water main, 50 LF of new 6-inch DI water main, 165 LF of new 4-inch DI water main, 13 fire hydrants, 4 air vacuum release assemblies, 1 blowoff assembly, 89 water services, 5 connections to existing water main, concrete driveway, timber stair replacement, and HMA trench patching. Temporary erosion/water pollution control, temporary traffic control and devices, property restoration and other miscellaneous items will also be necessary to complete the work. Schedule B: 1,460 LF of new 8-inch DI water main, 35 LF of new 6-inch Dl water main, 2 fire hydrants, 1 air vacuum release assembly, 13 water services, 4 connections to existing water main, temporary water main, soldier pile retaining wall, and HMA trench patching. Temporary erosion/water pollution control, temporary traffic control and devices, property restoration and other miscellaneous items will also be necessary to complete the work. Schedule C: 325 LF of new 12-inch DI storm main, 165 LF of new 8-inch DI storm main, connections to existing storm main, 12 Type-I catch basins, 2 Type-Il catch basins, concrete driveway, and HMA trench patching. Temporary erosion/water pollution control, temporary traffic control and devices, property restoration and other miscellaneous items will also be necessary to complete the work. A bid deposit in the amount of five percent (5%) of the bid total price must accompany each bid.
Award
Water / Sewer
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 26, 2024
January 24, 2025
Multiple Locations, Mercer Island, WA
Related To This Project
Mercer Island, WA
Bid Date: Nov 26 2024
Mercer Island, WA
Bid Date: Nov 27 2024
Mercer Island, WA
--
Mercer Island, WA
Bid Date: Dec 18 2024
Mercer Island, WA
--
Mercer Island, WA
Bid Date: Feb 19 2025
Mercer Island, WA
--
Mercer Island, WA
--
Mercer Island, WA
Bid Date: Nov 08 2024
Mercer Island, WA
Bid Date: Nov 15 2024
Mercer Island, WA
Bid Date: Sep 09 2024
Mercer Island, WA
--
Mercer Island, WA
--
Mercer Island, WA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
