BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Missoula, Montana. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

S Russell St Crossing - MSLA The work generally includes demolition of roadway and new surface improvements will be installed including 430 square yards of asphalt, 2,930 square feet of concrete, 350 linear feet of curbing, signing, pavement markings, and related work in accordance with the Plans and Specifications. Work will also include relocation of existing Rectangular Rapid Flashing Beacon (RRFB). Site Directions: The work site is located along Russell Street, just north of the Missoula Family YMCA and west of the Missoula County Fairgrounds. Est. Completion Date: Oct. 15, 2025 The work site is located along Russell Street, just north of the Missoula Family YMCA and west of the Missoula County Fairgrounds. The existing Rectangular Rapid Flashing Beacon (RRFB) west of the YMCA will be relocated to the north and improved pedestrian facilities will be constructed to provide a safer pedestrian route to the Fairgrounds Commuter Trail network. The work generally includes demolition of roadway and new surface improvements will be installed including 430 square yards of asphalt, 2,930 square feet of concrete, 350 linear feet of curbing, signing, pavement markings, and related work in accordance with the Plans and Specifications. The project is funded in part with funding from the FHWA Transporation Alternatives Program and is subject to all applicable Federal/State regulations, as indicated within the Contract Manual. All work must be substantially complete within 60 calendar days after the commencement date stated in the notice to proceed. Notice to proceed is flexible with the latest completion date of October 15, 2025. Questions regarding the project manual, drawings and specifications shall be directed to the Engineer: WGM Group, Inc. at 1111 East Broadway, Missoula, MT 59802 via phone at (406) 728.4611 or email at rsadowski@wgmgroup.com. Questions submitted after 12:00 p.m. (noon), local time, on November 19, 2024 are not guaranteed to be answered before the bid due date and time.

GC Bidding

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

19

13

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
5
Bidding Soon
56
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.