BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Salt Lake City, Utah. Conceptual plans call for the renovation of a educational facility; and for site work for a educational facility.

Granite School District is soliciting statements of qualifications from qualified vendors to provide architectural services for Brockbank JHS STEM project. Please review the attached event document for full details. One time purchase only. Project construction to be complete by August 1, 2025. The Granite School District is converting the former Cyprus High School second campus back to Brockbank Junior High School, emphasizing a focus on Science, Technology, Engineering, and Math (STEM). The concepts and needs outlined below are based on a preliminary site walk conducted by the district during summer 2024. Originally constructed in 1951, Brockbank Junior High School served the community until 2016, when the addition of ninth grade to Cyprus High School required additional classroom space, transforming Brockbank into a secondary campus for Cyprus High. Junior high students were then relocated to Matheson and Hunter Junior High Schools. With the upcoming completion of the new Cyprus High School campus at a different location, the district now plans to re-establish Brockbank as a junior high school with a STEM focus to better serve the needs of the community. The district's architectural study and design proposal include suggested improvements to support this reconfiguration and create a modern learning environment. This project is budgetarily constrained, with an approximate budget of $1.5 million. The selected architectural and engineering firm will be expected to develop cost-effective solutions that maximize the value of improvements while adhering strictly to the budgetary limitations. Creative approaches that prioritize essential upgrades and ensure a high-quality STEM learning environment within these financial constraints are essential. Award Construction Contract: Early May 2025 Construction: June 1, 2025 - August 1, 2025 Any additional questions regarding this solicitation are to be submitted via Online. The method of Contractor Selection has not been Determined at this time.

Conceptual

Educational

$1,500,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
25
Bidding Soon
528
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2025

img_map_placeholder

Multiple Locations, Salt Lake City, UT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.