BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2025 at 8:00 PM

Updated September 5, 2025

Renovation of an educational facility in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a educational facility.

Northwest Residential Area - Thermal Comfort Improvements - Phase 2 Project Location: Storrs Campus, 110 North Eagleville Road, Storrs, CT 06269 The project involves installation of air conditioning systems in Hanks Hall and Goodyear Hall of the existing 6 building Northwest residence complex. Cooling to be provided to floors 2 through 4 of the 2 buildings. Conditioned make-up air systems to be installed as part of the project. All work in the associated dorm rooms must be completed by August 7th, 2026. Heat for the dorm rooms must be operational by October 1, 2026. Remaining construction must be completed by December 1st, 2026. Cooling systems must be operational by April 15th, 2027. Installation to include new CHW HXs, pumps, dual temperature piping systems, fan coil units, make up air units, and associated controls. Installation to include all associated piping, insulation, ductwork, plumbing, power, controls and fire alarm. The make-up air units to be installed in new interior mechanical rooms. Vertical shafts through the dorms to be installed for new make-up air ductwork. REQUEST FOR INFORMATION QUESTIONS: All Requests for Information ("RFI") questions are to be posted under the Q&A Board Tab in the HuskyBuy sourcing event for this Solicitation. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted CLARIFICATIONS, ADDENDA, and INTERPRETATIONS: Proposers shall promptly notify the University of any ambiguity, inconsistency, or error which they may discover upon examination of the contract documents. PROJECT SCHEDULE/DURATION: Anticipated Contract Issuance/Notice to Proceed: November 2025 Construction is planned to start: December 15, 2025 Construction Duration: 12 months Questions deadline: 8/21/25 at 2:00 PM SELF-PERFORMANCE REQUIREMENT: If awarded this contract, the Contractor shall be required to perform not less than ten percent (10%) of the Total Contract Price with its own forces. SET-ASIDE REQUIREMENTS: The Set-Aside Requirement for this Project is that (1) not less than thirty percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Small Business Enterprises" ("SBEs") and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Minority Business Enterprises" ("MBEs") (the 10% set aside for MBEs may be included in the 30% set aside for SBEs). If the Contractor is an S/MBE, then any self-performed work may be included in the Set-Aside Requirement. The Contractor is responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors.

Post-Bid

Educational

$3,563,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
7
Bidding Soon
2,944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

December 15, 2025

Project location map

110 N Eagleville Rd, Storrs Mansfield, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.